1 / 13

Idea to In-Service (I2I) V&V Process Harry Bilicki, ANG-E72 Wanda Lopez-LaBarbera, ANG-E72

Idea to In-Service (I2I) V&V Process Harry Bilicki, ANG-E72 Wanda Lopez-LaBarbera, ANG-E72. I2I V&V Process. Purpose Provide a method/framework to enable effective and efficient V&V across applicable I2I touch points throughout the lifecycle

rene
Download Presentation

Idea to In-Service (I2I) V&V Process Harry Bilicki, ANG-E72 Wanda Lopez-LaBarbera, ANG-E72

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Idea to In-Service (I2I) V&V Process Harry Bilicki, ANG-E72 Wanda Lopez-LaBarbera, ANG-E72

  2. I2I V&V Process Purpose Provide a method/framework to enable effective and efficient V&V across applicable I2I touch points throughout the lifecycle Ensure that the work products continue to align with the agency’s overall goals and evolving vision as a program moves through the lifecycle Objective Incorporate V&V into the overall I2I process

  3. V&V Concepts

  4. Baseline V&V

  5. FAA Planning Documents Great New Idea Strategic Input Validation Thread (s) In-Service

  6. NAS Technical Documents Great New Idea Con-Ops Strategic Input Enterprise Architecture NAS RD Validation Thread (s) In-Service

  7. V&V Concept for I2I Process - How it Works Great New Idea Mature Idea Deployed System System Portfolio Plans I2I Process V&V Sub Process Artifacts SI SA Validate Idea ConOps-Arch-Req CRD Requirements Concept of Use SI Performance Spec Operational Rqmts Capabilities ISM All Strategic & Technical Documents

  8. Align I2I V&V Process with AMS Lifecycle I2I Process Touch Points V&V Process

  9. I2I V&V Summary

  10. How We Developed the I2I V&V Framework

  11. Example: One Touch Point for Service Analysis V&V I2I Process Touch Points and V&V Activity Decomposition of Service Needs into Operational Requirements, 2.6.1 • Validate initial Operational Requirements against the NAS Requirements Document, EA, NAS ConOps, and the Service Needs Statement V&V Criteria Documents • NAS Requirements Document • EA • NAS ConOps • Service Needs Statement Resultant V&V Output • Validated Initial Operational Requirements • V&V Record

  12. I2I V&V Summary A disciplined V&V process is essential to ensure quality work products in the I2I process A detailed I2I V&V process was developed and approved to assess work products against established criteria Perform V&V early and incrementally to limit the impact of issue/defects throughout the lifecycle

  13. Questions?

More Related