An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE SCOTTISH DATACENTRE SCENE CHARLIE BOISSEAU 27.3.13

  2. THE SCOTTISH DATACENTRE SCENE • INTRODUCTION • OUR DATACENTRE JOURNEY • THE (NOT SO) GRAND TOUR • CONCLUSIONS

  3. FLUENCY EDINBURGH

  4. FLUENCY EDINBURGH

  5. SPOT THE PROBLEM?

  6. THE (NOT SO) GRAND TOUR

  7. INVERNESS There’s nothing in Inverness!

  8. ABERDEEN • 2150 ft2 • 800kVA Primary Power • 630kVA Backup Power • N+1 Cooling • BT & C&W Fibre

  9. ABERDEEN • Tier 3 • 3,300 ft2 • 10,000 kVA Total Power • BT, C&W & SSE Fibre

  10. Tier 3+ • 200 Rack Capacity • 550kVA N+1 Power • 300kVA N+1 UPS • BT, Virgin, SSE, C&W DUNDEE DUNDEE

  11. GLASGOW • 11,000ft2 • 200kVA Primary Power • Soon - 1MVA Power • N+1 Cooling • FM200 Suppression • BT, C&W & Virgin Fibre

  12. GLASGOW • 12,300ft2 Data Floor • 1000kVA Power • BT, Virgin, Thus, Geo, Level3 & Cogent Fibre • 0.75kW/m2 Cooling

  13. Tier 3 • 10,000ft2 • 1.2MW Primary Power • 1.2MW N+1 Backup • FM200 & Argonite Suppression • BT, Virgin, C&W Fibre EDINBURGH

  14. 32,000ft2 • Dual 3.2MvA Primary Power • N+1 Cooling • FM200 Suppression • BT, C&W & Virgin Fibre EDINBURGH

  15. (SCOLOCATE) • Tier 3 • 75,000ft2 • 2 x Primary 3MW Feeds • Full N+1 Backup Supply • 14 Fibre Operators • 30+ Carriers EDINBURGH

  16. DID I MISS ANYONE? NOTABLE ABSENCES: BT, SSE, VARIOUS BANKS & OTHER PRIVATE DCs