1 / 9

Bunker procedures

Bunker procedures. keep it clean. BUNKERING CONCERNS ABOUT. Sufficient operational safety Safeguard environment Check delivered quantities Check delivered quality. WHY IS IT A PROBLEM. Limited number of crew Other activities Crew changes Fast turn around time Bad planning

reya
Download Presentation

Bunker procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bunker procedures keep it clean

  2. BUNKERING CONCERNS ABOUT • Sufficient operational safety • Safeguard environment • Check delivered quantities • Check delivered quality

  3. WHY IS IT A PROBLEM • Limited number of crew • Other activities • Crew changes • Fast turn around time • Bad planning • Local circumstances • Other causes

  4. BUNKERING STANDARD PROCEDURES • Might be not available • Differ from port to port • Suppliers standards • Company procedures • Part of ISM • New ISO Code 13739 “Methods for specifying practical procedures for transfer of bunker fuels to ships” (1998 ?)

  5. CHECK-LIST CONCERNS ABOUT • Personal safety • Ships safety • Environment • Communication • Technical information • Responsibilities

  6. CHECK-LIST ITEMS 1 • Pre-bunkering meeting • Scuppers • Flame screens • Pre-loading plan • Overflow tank empty • All valves operational • Sounding instruments • Sounding tables • Communication

  7. CHECK-LIST ITEMS 2 • Signals hoisted • NO SMOKING signs • No hot work • Mooring condition • Bunker barge mooring, fendering and access • Deck lightning • Agreed pumping rate • Hose connections

  8. CHECK-LIST ITEMS 3 • Go-ahead signal given • Samples • Delivery receipt • Pollution control equipment (SOPEP) • Firefighting equipment • Bridge informed

  9. QUALITY/QUANTITY CONTROL • O/B Bunkerbarge • Flow meter • Independent surveyor • O/B testing • Laboratory test • Sealed samples

More Related