1 / 34

TRI-MEweb : The Future Is Now Juan Parra

TRI-MEweb : The Future Is Now Juan Parra. Washington DC November 4, 2010. Agenda. Background TRI reporting trends Issues New features in TRIMEweb Ry2010 Future enhancements. What is TRI-MEweb ?. EPA’s TRI electronic reporting system Web-based application on CDX

reyna
Download Presentation

TRI-MEweb : The Future Is Now Juan Parra

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRI-MEweb: The Future Is NowJuan Parra Washington DC November 4, 2010

  2. Agenda • Background • TRI reporting trends • Issues • New features in TRIMEweb Ry2010 • Future enhancements

  3. What is TRI-MEweb? • EPA’s TRI electronic reporting system • Web-based application on CDX • No more software to download • Can be accessed anywhere there is an internet connection • Enhanced Security • File format is extensible mark-up language (XML) instead of flat file

  4. Why TRI-MEweb? • Built-in data corrective software • No need to test operating system/software compatibility • Application changes can be made instantly • Will lead to earlier data releases due to increases in internet reporting • 95% reported electronically

  5. RY 2009 TRI-MEweb • Approximately 19,642 (94%) facilities used the TRI-MEweb application to submit 78,297 (95.6%) chemical forms for RY 2009. • 62.15% of TRI Facilities and 67.1% forms at the end of RY2008 were submitted using TRI-MEweb • TRI-MEcd/desktop was retired in RY2008 • Number of facilities reporting on all media was down 7% (5% in previous years) • 8% decrease of Form R and 9% decrease in Form A submissions.

  6. TRI-MEweb Submission Trend

  7. TRI Trends

  8. RY2009 TRI-MEweb Issues • Users had trouble finding/generating their Electronic Signature Agreement (ESA) • CDX has recently changed from SSL to TLS encryption. • CDX login page will not appear and seems to be off-line • If you are using Internet Explorer, go the Tools menu and select Internet Options. “Use TLS 1.0” should be checked. • Confusion between transmitting form to CDX to be certified and certifying form to be submitted to EPA for approval

  9. RY2010 Solutions • CDX email will be sent to CDX inbox AND CO’s email address with PDF attachment of ESA. • TRI-MEweb Troubleshooting guide included in RY2010 RFI. • TRI-MEweb transmission, certification and verification process flow has been redesigned.

  10. Getting Ready for TRI-MEweb RY2010 • Release Date of: January 2011 • Technical Contacts will receive an email with a facility access key • If they didn’t, either contact the TRI regional coordinator/CDX Helpdesk or use the last year’s technical contact name and phone number method to access the application.

  11. Current TRI-MEweb Features • Pre-populates Current Year Forms • Automated Section 8 Calculations • Data Quality Web Services (Off-site Transfer POTWs and RCRA sites) • Data Standardization (Parent Company) • Data Validation • Electronic Withdrawals • Third Party Load Tool

  12. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool

  13. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO

  14. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service

  15. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service • Redesigned of Transmission, Certification and Verification Process

  16. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service • Redesigned of Transmission, Certification and Verification Process • Facility Info Consolidation

  17. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service • Redesigned of Transmission, Certification and Verification Process • Facility Info Consolidation • Redesigned Schedule 1 Dioxin interface

  18. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service • Redesigned of Transmission, Certification and Verification Process • Facility Info Consolidation • Redesigned Schedule 1 Dioxin interface • TRI-MEweb Bookmarks

  19. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service • Redesigned of Transmission, Certification and Verification Process • Facility Info Consolidation • Redesigned Schedule 1 Dioxin interface • TRI-MEweb Bookmarks • Welcome Page Form Summary Enhancements

  20. New RY2010 TRI-MEweb Features • New Web-based Threshold Tool • Improved ESA notification to CO • New Water Body Web Service • Redesigned of Transmission, Certification and Verification Process • Facility Info Consolidation • Redesigned Schedule 1 Dioxin interface • TRI-MEweb Bookmarks • Welcome Page Form Summary Enhancements • Updated TRI-MEweb Resource website

  21. The Future • Add additional the functionality to TRI-MEweb (RY2011) • FRS Facility Location Standardization • Enhanced TRIAL software • CDX enhancement (maybe in Ry2010?) • LexisNexus –electronic ESAs

  22. TRI-MEweb • Questions? • Concerns? • Comments?

  23. Contact Information Juan Parra Environmental Engineer Parra.juan@epa.gov 202 566-0499

More Related