300 likes | 322 Views
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC. University of Siena I.N.F.N. Pisa Department of Physics TOTEM -T2 TRIPLE GEM DESCRIPTION OF SIENA ACTIVITY E. Oliveri. Outline.
E N D
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC University of Siena I.N.F.N. Pisa Department of Physics TOTEM -T2 TRIPLE GEM DESCRIPTION OF SIENA ACTIVITY E. Oliveri Totem Collaboration Meeting 8 June 2006
Outline • PART I TRIPLE GEM CHAMBER Assembly • PART II Siena TRIPLE GEM Testing Laboratory • PART III TRIPLE GEM Simulation • PART IV Time Schedule Totem Collaboration Meeting 8 June 2006
Outline Part I • CERN • Components • G&A Engineering • Assembly & preliminary test • Siena Physics Department – I.N.F.N. Pisa • Protocol and equipment for the assembly • of the chamber • Test of the chamber • Simulation & data analysis TRIPLE GEM CHAMBER Assembly • Partners • Assembly and Test at G&A Engineering • Problems and upgrading of assembly process Totem Collaboration Meeting 8 June 2006
Assembly and preliminary test at G&A Engineering Pressure Test: Dp<1mbar @ 11.5mbar OVP in 15’ Leakage Current Test: I<100pA for 5’ @ 500V for every foil Totem Collaboration Meeting 8 June 2006
Problems and upgrading of assembly process Problems • Gas line interrupted between the chamber and the gas fitting. • Glue on electrodes foil Upgrading • A more accurate inspection of incoming components. • Automatic deposition with undervacum degassed glue (already used). • Cut foils borders before the final assembly. • Stretch the DRIFT foil (using the plexiglass chassis) before sticking it on the spacer. Totem Collaboration Meeting 8 June 2006
Outline Part II Siena TRIPLE GEM Testing Laboratory • Gas Supply System • TRIPLE GEM Support & Services • Power & Acquisition Systems Totem Collaboration Meeting 8 June 2006
PRESSURE CONTROL: • Pressure on the chamber in the range of mbar, avoiding overpressure bigger than 10mbar • FLOW CONTROL: • Control of fluxes of nearly 2-6 l/h of Ar-CO2 (70-30) Gas Supply System The Requirements Totem Collaboration Meeting 8 June 2006
First Stage Pressure Reduction P3=0.5-8 bar AirLiquide HBS 240 8 3 (Double Stage) Flow Control ROTAMETER VOEGTLIN V300 (3l/h-5l/h-16l/h) + Q-Flow valve NS2 Secon Stage Pressure Reduction P5=5-50 mbar TESCOM-EUROPE Regulus1 - 5-50mbar (Single Stage) G1 G2 V1 V2 V3 TP1 TP3 G3 RM P1=100 bar V4 V6 BB1 V8 V5 V7 V9 V10 BB2 TP4 TP2 F1 NUPRO filter SS-2TF-LE 0.5 mm Gas Supply System The Project Special Thanks to A.Morelli, I.N.F.N Genova, for suggestions & components. Totem Collaboration Meeting 8 June 2006
The Gas Supply System Term of delivery for the pressure reducer postponed to half june for manifacturing problems Variable Area Flowmeter mbar Differential Pressure Gauge Totem Collaboration Meeting 8 June 2006
Strips and Pads ReadOut TRIPLE GEM Support & Services Strips & Pads Connections GND Connection Gas Supply HV Supply Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Support & Services Mechanical Workshop The mechanical workshop: C. Stanghini & L. Stiaccini. Totem Collaboration Meeting 8 June 2006
4CH LeCroy 1GHz Oscilloscope Leakage Current Measurement Keithley 6485 Picoammeter Power & Acquisition System High Voltage Power Supply Strips & Pads Signal Measurement 4CH Digital Oscilloscope TDS 3034B Tektronix 300MHz 2.5GS/s ADC - 2249W LeCroy 12 Channels 4 CH High Voltage Power Supply CAEN N472 High Voltage Power Supply Monitoring Strips Read Out Board 16 Groups, each of 8 strips Pads Read Out Board 15 Groups, each of 8 pads Keithley 2700 Multimeter + Scanner Totem Collaboration Meeting 8 June 2006
Power & Acquisition System Electronical Workshop The electronical workshop: R. Cecchi Developmement of readout board for single strip & single pad signal acquisition Totem Collaboration Meeting 8 June 2006
Power & Acquisition System Acquisition System Delay lines ADC Modules Dual Timer CAEN Multiscaler 8Ch. 100MHz 8Ch. Low THR Discriminator CAEN Cosmic-Ray acquisition system Coincidence Unit LeCroy ~2cm x 2cm Totem Collaboration Meeting 8 June 2006
Outline Part III TRIPLE GEM Simulation • Software Tools • Maxwell2dSV • The Garfield approach • Signal analysis: • time, space & intensity • strip & pad signals Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Simulation Software tools Special Thanks to D.Pinci, LHCb Roma-Cagliari Group, for precious initial input. Garfield: Main framework. Maxwell2DSV: Electric field map. Magboltz: Electron/ion drift velocity and diffusion coefficients. Imonte:Townsend and attachment coefficients for given gas mix. Heed: Energy loss by ionization in gas; cluster production. Totem Collaboration Meeting 8 June 2006
The hole field Map The weigthing Field (Ramo Th.) TRIPLE GEM Simulation The Field Maps - Maxwell2DSV 3D Analysis from Maxwell2DSV obtained by symmetry operation Others Electrodes & Conductors @ GND Readout Electrode @ 1V 3D Analysis from Maxwell2DSV obtained by symmetry operation 2D Software limitation: We can’t simulate more than one hole 3D Software upgrape: The elementary cell allow simulations that involve near holes 2D Software limitation: In pad signal analysis we can’t have a simulation close to four pads corner 3D Software upgrape: We can describe all elctrodes configuration Totem Collaboration Meeting 8 June 2006
DRIFT GEM foil TRANSFER GEM foil TRANSFER GEM foil INDUCTION The Drift Zone The Transfer Zone TRIPLE GEM Simulation The Garfield approach -Ionization process -Diffusion and drift toward the Gem t & st transfer y n t & st drift Diffusion and drift between the Gem planes sxz transfer sxz drift The Induction Zone The GEM foil Avalanche in the Gem planes t & st induction sxz induction -Diffusion and drift toward the electrodes -Signal induction Gain Totem Collaboration Meeting 8 June 2006 I(t)
m 10Gev in Ar-CO2 (70-30) @ stp Mean ~ 27 Most Probable Value ~ 13 RMS ~ 30 TRIPLE GEM Simulation Drift Zone heed 0.3 cm 94 x 0.3 ~ 28 Totem Collaboration Meeting 8 June 2006
5kV/cm in 2mm 5kV/cm in 2mm DRIFT VELOCITY TRIPLE GEM Simulation The Transfer Zone magboltz ~8 cm/ms @5kV/cm mean ~ 26ns t = d/v = (0.2 / 8) ms= = 2.5 e-2 ms = 25 ns Ar-CO2 (70-30) DIFFUSION COEFFICIENTS magboltz ~260 um for 1 cm @5kV/cm rms~115mm Ar-CO2 (70-30) Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Simulation The multiplication process Mean G ~ 15 No outgoing e- ~30% Townsend Coeff. Totem Collaboration Meeting 8 June 2006
Signal on PAD EFFECTS OF ELECTRODES CONFIGURATION ON DIRECT & CROSS CURRENTS The weigthing Field TRIPLE GEM Simulation Signal Collection Direct Electrodes Configuration: ONLY PADS ~ 370 nA Cross 0 nA Ramo Theorem Ik(t) = -qv(x,t)xEkw(x) Electrodes Configuration: PADS & STRIPS Direct ~ 150 nA Cross Totem Collaboration Meeting 8 June 2006 ~ 70 nA
TRIPLE GEM Simulation Starting Point for signal collection Lateral position and arrival time for 1k e- uniformly distributed in drift zone From 1k e- uniformly distributed in drift zone, diffusing for 7 mm in a field of 3 kV/cm in Ar/CO2 (70/30) @ STP X end DRIFT GEM1 GEM2 GEM3 READOUT t end Neglecting GEM planes holes effects -Readout current results normalized to 1k primary electrons -Expected current obtained multiplying by <Ne> in drift zone (27) and by total gain (G3-GEM ~ 3.4x103) Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Simulation Signal Time analysis DRIFT h e- td h e- GEM1 Signal of electrons not collected by the readout electrode td t CROSS SIGNAL GEM2 GEM3 ti READOUT Signal of electrons collected by the readout electrode Readout Pad DIRECT SIGNAL DRIFT VELOCITY ~7000 cm/usec @3kV/cm td t td ti Ar-CO2 (70-30) Totem Collaboration Meeting 8 June 2006
DRIFT DRIFT GEM1 GEM1 GEM2 GEM2 GEM3 GEM3 Readout Pad Readout Pad Neglecting GEM planes holes effects TRIPLE GEM Simulation Signal Space analysis sx~300 mm 10mm Upgrading to consider the effects of GEM planes holes READOUT DIFFUSION COEFFICIENTS ~260 um for 1 cm @3kV/cm Trasversal Longitudinal x1 x6 x6 Ar-CO2 (70-30) x6 x6 x12 x6 x12 x6 Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Simulation Signal Intensity & Shape MULTIPLICATION FACTORS Number of el. produced per incident particle ELECTRONS COLLECTION Number of el. collected by electrode as direct induced current (e- captured by the readout electrode) or cross induced currents (e- captured by the others electrodes) Gas & Drift Zone Length ReadOut Geometry & Spatial distribution of the electrons cloud Mean ~ 27 Most Probable Value ~ 13 RMS ~ 30 DRIFT <Ne> G1 GEM1 G2 GEM2 GEM3 G3 READOUT Weigthing field lines Readout Pad Mean G ~ 15 TripleGem Voltage, Gas & GEM foil geometry ReadOut Geometry Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Simulation Strips Signals Totem Collaboration Meeting 8 June 2006
TRIPLE GEM Simulation Pads Signals Totem Collaboration Meeting 8 June 2006
Outline Part IV Time Schedule Totem Collaboration Meeting 8 June 2006
Time Schedule The lab is available 16 30 Work on simulation (from 100% to 0% of working time) Planning and manufacturing of the test board Cosmic Ray Signal Apparatus test (coincidence and scintillators’ signal on oscilloscope) Pinci’s Meeting Simulation Software 17 28 HV and 2 simple readout Board in Siena The G&A Triple GEM in Siena Gas System Assembly & test Second Stage Pressure Reducer Order 17 23 24 26 4 Ar-CO2 Cylinder in Siena 15 First Stage Pressure Reducer in Siena Morelli in Siena Gas System Planning & Companies Contacts First Contact With Morelli Term of delivery for the pressure reducer Manifacturing problems New term of delivery half june Totem Collaboration Meeting 8 June 2006