1 / 13

Technical / Procurement Overview

Technical / Procurement Overview. Acquisition is a Team Effort. Starts with technical requirements Technical personnel must consider themselves part of the acquisition process: not as something separate Requirements translated into procurement actions

Download Presentation

Technical / Procurement Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical / Procurement Overview

  2. Acquisition is a Team Effort • Starts with technical requirements • Technical personnel must consider themselves part of the acquisition process: not as something separate • Requirements translated into procurement actions • Procurement personnel must have communication paths with technical team • SEWP’s goal is to facilitate this teamwork

  3. Goals • Provide 2 basic scenarios • General guidelines • Feedback

  4. SEWP’s Effectiveness • Use of SEWP Tools and contracts is most effective when an organization has a known and mutually agreed upon procedure for technical / procurement interaction. • The actual procedure is less important than having a procedure

  5. 2 Scenarios • Scenario 1: • Technical staff obtain only preliminary quotes (RFIs) and procurement always separately issues final RFQs • Scenario 2: • Technical staff obtains quotes; Procurement reviews the request and quotes and may or may not re-issue an RFQ

  6. Technical POV • Perform initial market research • Does not need to be tied to a contract vehicle • Does not require actual quotes • Emphasis on Research • SEWP RFQ tool can be used via the Market Research option • Best for general questions • Recommended to not use to obtain preliminary quotes • Contact SEWP for any scope or availability concerns

  7. Technical POV • Obtain quotes • Use SEWP RAQ (Request A Quote) option • Follow Fair Opportunity Guidelines • Follow Organization’s procedure • If procurement will follow-up with a second round RFQ or this is for budgetary/research purposes only, note in the Summary section that “This is an RFI (Request for Information”

  8. Technical POV • Create Purchase Request (PR) in Agency system • When procurement staff is assigned: • Set Secondary Contact to personnel

  9. Procurement POV • Notify technical staff when PR arrives • After assigned as secondary contact • Review quote request and quotes • Determine next steps based on Agency / Organization process

  10. Procurement POV • Scenario 1 (Agency Policy to issue a final RFQ from Procurement) • Either re-issue Technical Request or Copy to a New Request • Indicate in Summary area that this is a Procurement RFQ • Verify Quotes

  11. Procurement POV • Scenario 2 (Agency Policy allows quotes from technical request) • Verify Quotes • Verify Fair Opportunity • Determine if Best Value Decision documented • Any concerns – re-issue RFQ

  12. Procurement POV • Regardless of policy, things to keep in mind • Need to Verify Quotes • Fair Opportunity • Number of Quotes • Best Value determination • Notification

More Related