330 likes | 472 Views
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager. XMM-Newton. Science Operations & Data Systems Division Research & Scientific Support Department. 1. Page 1. Meeting/Action Description Actionee Due
E N D
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 1 Page 1
Meeting/Action Description Actionee Due EPIC TTD-0013/1 Make SDF available to interested people BA EPIC-CAL-0011/5 Verify pn QE with the crab FH EPIC-CAL-0012/4 Provide VILSPA with a tool to check MOS JB 2003-09-25 data for "3 missing raws" feature EPIC-CAL-0012/5 Provide VILSPA with new sequences with TA2003-09-25 old BS EPIC-CAL-0013/1 Put new MOS redistribution into DT SS2004-03-24 EPIC-CAL-0013/4 Change pn long term CTI in CCF MK 2004-03-24 EPIC-CAL-0013/5 Implement CTI tuning functionality for pn RS2004-03-24 eFF in CAL EPIC-CAL-0013/6 Update pn CTI CCF for eFF CTI tuning MK 2004-03-24 EPIC-CAL-0013/7 Enable the OAL the determine the PN RS 2004-03-24 offset maps (ODI) OPEN ACTIONS XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 2 Page 2
Significant dates and meetings Operations General Calibration Points Data Processing - SAS Data Processing - SSC XSA Miscellaneous CONTENTS XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 3 Page 3
SIGNIFICANT DATES AND MEETINGS XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 4 Page 4
AO4 Cycle: Call 30 Aug.2004 Close Phase I 08 Oct.2004 Open phase II for first PI group 10 Jan.2005 Open phase II for second PI group 17 Jan.2005 Close phase II for first PI group 21 Jan.2005 Open phase II for third PI group 24 Jan.2005 Planned maintenance (07:30z to 11:30z) 25 Jan.2005 Close phase II for second PI group 28 Jan.2005 Close phase II for third PI group 04 Feb.2005 Close XRPS 11 Feb.2005 SIGNIFICANT DATES
closed on the 8th of October 2004 657 valid proposals requesting, in total, 101747 ksec AO4 covers one year with 14500 ksec observing time available ==> over-subscription factor is 7.0 484 PIs from 23 countries, mostly ESA member states, USA & Japan n-countries increases to 35 if co-investigators are considered about 1600 individual scientists involved AO4
Users Group meeting #5 02/03 Jun. 2004 XMM-Newton 5-years in flight 10 Dec. 2004 all Calls over-subscription by x7 or more >700 refereed papers EPIC CAL/OPS meeting @ Mallorca 01-03 Feb. 2005 Cross-calibration Workshop at ESAC 16-18 Mar. 2005 EPIC Consortium Meeting @ Schloss Ringberg 10-13 Apr. 2005 Users Group Meeting #6 19/20 May 2005 The X-ray Universe 2005, El Escorial 26-30 Sep. 2005 ADASS, El Escorial 03-07 Oct. 2005 NB:An annular eclipse of the Sun will take place at Madrid at the interface between these last two conferences. SIGNIFICANT DATES (contd.)
AT THAT MEETING WE KNOW WE MUST SHOW : decisive progress in the calibration cook-book for doing science with EPIC at < 1 keV Cross-calibration status document OTHER ITEMS DEMANDED BY UG : get RGS background accumulator into SAS 6.1 - done pursue 2005 Conference - done report on slew survey at next UG meeting - in progress get RGS Superfluxer into SAS 7.0 - in progress pursue EPIC background modeling as next priority XMM-NEWTON USERS GROUP (19/20 May.2005)
The XMM-Newton and Chandra space observatories have operated for half a decade & continue to provide superb data which is changing our view of almost every aspect of the Universe at high E. In the near future AstroE-2 will provide enhanced capabilities for high res. spectroscopy, & Swift will soon join HETE-2 in making detailed studies of gamma-ray bursts. Significant new insights are also emerging from Integral's view of the sky at hard X-ray & gamma-ray energies. "The X-ray Universe 2005" symposium will showcase the results and discoveries from current and near-future missions and provide a forum for the discussion of astrophysical themes with a high-energy connection. Scheduled to last for 5 days & embrace the wide range of astrophysics in which XMM-Newton, Chandra & other missions are making important advances. Session topics will include: * stars, stellar systems, planetary & cometary studies * interacting binary systems, SNR, pulsars * the ISM and diffuse Galactic emission * AGN, galaxies, clusters of galaxies * surveys, population studies and the cosmic X-ray background * gamma-ray bursts Conference 2005 - Aims and Scope
OPERATIONS XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 10 Page 10
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 11 Page 11
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 12 Page 12
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 13 Page 13
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 14 Page 14
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 15 Page 15
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 16 Page 16
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 17 Page 17
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 18 Page 18
SUPPORT TO OTHER MISSIONS (LEOPs etc.) ROSETTA EUTELSAT W3A SCOS 2000 tests on Rev.900, Rev.935, Rev.940(all modes) MAJOR SOLAR FLARE IN THE PAST WEEK in last hours of Rev.936 normal operations resumed on rev.939 instruments mostly in safe mode any impacts TBD OPERATIONS
GENERAL CALIBRATION POINTS CCFs released NRCOs XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 20 Page 20
XMM-CCF-REL-166 EPIC MOS Metrology 13 May 2004 XMM-CCF-REL-167 PSF of the X-ray telescopes 19 May 2004 XMM-CCF-REL-168 EPIC absolute astrometry 21 May 2004 XMM-CCF-REL-169 EPIC MOS low energy response & QE 05 Aug 2004 XMM-CCF-REL-170 MOS Filter Transmission 14 Jun 2004 XMM-CCF-REL-171 RGS Instrumental Flourine Absorption 24 Jun 2004 XMM-CCF-REL-172 Improving pn Window mode CTI correction 19 Jul 2004 & refining long term CTI corr. all pn Modes XMM-CCF-REL-173 RGS DARKFRAME normalisation 19 Jul 2004 XMM-CCF-REL-174 pn telescope effective area modification 09 Jun 2004 XMM-CCF-REL-175 EPIC PN Bad Pixels 05 Jul 2004 XMM-CCF-REL-176 RGS QE Shortest l Corr. Factors 27 Jul 2004 XMM-CCF-REL-177 Low-E noise rejection refinement for pn 15 Sep 2004 XMM-CCF-REL-178 Masking MOS bright patches: MOS1 CCD4 14 Sep 2004 XMM-CCF-REL-179 RGS Background Spectral Templates 15 Oct 2004 XMM-CCF-REL-180 EPIC PN masked mode parameters 15 Oct 2004 XMM-CCF-REL-181 EPIC MOS fixed offset 29 Oct 2004 XMM-CCF-REL-182 Ecorr for Extended Full Frame mode 12 Nov 2004 XMM-CCF-REL-183 EPIC-pn spectral response 11 Nov 2004 XMM-CCF-REL-184 EPIC MOS response 10 Dec 2004 CCF RELEASE NOTES IN PERIOD
34 Refinement of pn-CTI correction 35 EPIC soft-energy X-cal. on GD 153 Uncommissioned 36 XMM-Newton cross-calibration on H1426+428 37 Use of a single RGS2 ADC Uncommissioned 38 4 pointing raster on 1ES0102 39 The absolute Flux calibration of OM 40 The OM UV red leaks 41 Sanity check of MOS filters Uncommissioned 42 HZ 43 XMM/Swift cross-calibration 43 H1426+428 XMM/Swift cross-calibration 44 Rejected: PKS0537-286 XMM/Swift cross-calibration 45 HZ 43 XMM/Swift cross-calibration NRCOs
DATA PROCESSING - SAS XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 23 Page 23
Version 6.0.0 of the Science Analysis System (SAS) released March ‘04 4th VILSPA SAS Workshop June 8 to 11 ‘04 Version 6.1.0 of the Science Analysis System (SAS) released 01 Dec.’04 RGS background modelling capability an upgrade of the OM grism data analysis new, experimental, treatment of Time Correlation Next public release will be when we gain confidence with the SAS version currently under test for the bulk-reprocessing SAS
DATA PROCESSING - SSC XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 25 Page 25
Routine Phase statistics: As of mid-January 2005 … Scheduled (revs 103-926) 4013 Performed 3834 ODFs produced 3759 PPS products 3634 STATUS OF DATA GENERATION XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 26 Page 26
Turn-around time between data acquisition and data notification to GO (PIPE) as of 31-Dec-2003 XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 27 Page 27
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 28 Page 28
XSA XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 29 Page 29
Data processing facilities in the XMM-Newton Science Archive (XSA) XSA v2.7 released November 2004 full suite of data proc. facilities can be triggered from XSA user interface latest public SAS reprocessing of raw telemetry (ODF) for all XMM-Newton cameras through meta-tasks ("emproc", "epproc", "rgsproc", "omichain", "omfchain") ftp retrieval of products filtering of EPIC calibrated and concatenated event lists prior to retrieval interactive extraction of spectra and light curves from sky regions in EPIC exposure images in the XSA FITS viewer tool response matrices generated, & spectral products. users can now monitor download or processing status through "Request Monitor" tool XSA
MISCELLANEOUS PUBLICATIONS OTHER (RGS ADC …) XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 31 Page 31
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 32 Page 32
XMM-Newton Science Operations & Data Systems Division Research & Scientific Support Department 33 Page 33