1 / 12

5G Timing - Customers Deployments

Explore the advanced 5G DWDM Timing Architecture for Tier 1 customers, ensuring <130ns timing precision with ePRTC technology. Bi-Di SFPs, G.8275.1 Full-On-Path Support, and more tailored features for optimal synchronization. Discover the comprehensive network setup, results, and performance insights. Contact Deran Gilat for details.

riverac
Download Presentation

5G Timing - Customers Deployments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 5G Timing - Customers Deployments SyncSmart 2018

  2. EU Tier 1 customer #1 : Full on Path support Timing Transport Architecture

  3. Tier 1 customer: 5G DWDM Timing Architecture (<130ns) Cs bei NSO WEST EAST bereits Core Site 1 Core Site 8 vorhanden • Bi-Di SFPs (single strand) to minimize asymmetry • G.8275.1, L2 Full-On-Path Support profile • OADM drops specific Lambdas for Sync (two wavelengths) • ePRTC to minimize timing error • T-BC Class D (<5ns) – TP4100 Multi-band GNSS Multi-band GNSS ePRTC TS3550 ePRTC TS3550 Cs Cs ToD interface (RS422 ToD interface (RS422 T - GM TP4100 T - GM TP4100 Site 2 ET ET 7IVV 7IVV Site 7 57,31 km 80,46 km OADM OLA Site 6 46,96 km 7IV9 UZ04 31,90 km Site 3 Site 5 Site 4 59,24 km OADM OADM 21,82 km T - BC - D 47,10 km 7IV9 7IV9 T - BC - D W O OADM OADM 7IV9 W O 7IV9 T - BC - D T - BC - D W O W O T - BC - D T - BC - D W O W O Measurement

  4. Core Site Detailed Architecture TP4100

  5. Transport Site Detailed Architecture W O 4*SFP 4*SFP+ 1GE el. (RJ45) (PTP-FTS/SyncE) + Management T-BC Class D needed cTE<5 ns 4 2 3 1 4 2 3 1 2 1 M OCXO 4 5 6 3 S M 4*SFP 4*SFP+ 2 3 4 1 4 2 3 1 S SSU- 2000E OCXO 4 5 6 S M 1 2 3 AGS/xy #5 ………………………………………… AGS/xy #4 AGS/xy #2 AGS/xy #3 AGS/xy #1 AGS/xy #12

  6. NA Tier 1 customer : VRAN network without on-path support.

  7. Network Setup with TP4100 SlaveTC14

  8. TC14 TP4100 Slave Results • First 18 hours of Reference Client with 3 HOP TC14 Traffic Loading on Verizon 3 Hop Mobile Backhaul Demo Network. Started with none loaded connection and the TC 14 traffic load started nominally 1 hour into test window.

  9. TC14 TP4100 Slave Results • The graph below shows the cumulative time error distribution of the reference client. The 90% performance is within 100ns dynamic accuracy under the TC14 3 Hop Test condition.

  10. Static 40%30% and TC14 TP4100 Slave Results • First 18 hours of Reference Client with 2 HOP TC14 Traffic on 10G links and 40-30 Loading on 1G links to see contribution of the 1G portion to time accuracy.

  11. Static 40%30% and TC14 TP4100 Slave Results • The dynamic accuracy under this test is now 50ns with 90% confidence. This shows that half of the accuracy budget is consumed by the 7750 operating with TC14 dynamic load tests.

  12. Thank YouEran Gilat – Systems Architect Engineer FTDeran.gilat@microsemi.com

More Related