An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CFEB Crosstalk calibration • Run 126158 (01/30/2010) • Failed for most of the chambers

  2. Failed in sub-test “Pulse Peak Position in Time” • Pulse Peak position is shifted by ~25ns • Didn’t observe it in December before shutdown January December

  3. Strange crosstalk signal shape and signal line shape January Bad January Bad December Good December Good

  4. Need comments from CFEB Calibration DAQ Experts • Was it temporary DAQ glitch? (need to take another run to check) • Was pulsing procedure changed recently? • Why not all chambers are affected and some of them still show good signal shapes? • Should we change analysis to accommodate those changes?