An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECAL Detector Control System : Status Report G. Dissertori ETHZ 17.10.2002 G. Dissertori ETHZ

  2. ECAL Electronics, DCS Outline • News • The M0’ experience • Current activities • Plans/Next • Conclusions G. Dissertori ETHZ

  3. ECAL Electronics, DCS News • Specification document finally released (today) • collected comments from P. Bloch and from the members of the DCS group • circulate now inside the collaboration • Deputy project leader • would like to propose Serguei Zelepoukine from IHEP Protvino as Deputy Project Leader G. Dissertori ETHZ

  4. ECAL Electronics, DCS The M0’ experience • Excellent work done by S. Zelepoukine and the Belgrade group • Precision Temperature Monitoring • we can achieve the precision required • The ATLAS ELMB is a viable backup solution for the readout system if placed not too close to the detector • Safety system • A safety system with interlocks to the HV/LV has been built and operated • discovered large sensitivity of the PLC to the environmental noise --> to be propagated to JCOP/ITCO • PVSS on Windows: not yet as stable as we would like... • no interface yet to the DAQ G. Dissertori ETHZ

  5. ECAL Electronics, DCS Current activities • Sensor issues • Humidity sensors : • together with Tracker DCS group a large number of possible sensor types is currently evaluated, tested, irradiated etc. • Specifications (chosen sensor) hopefully by end of the year. • Pressure/flow meters : • together with Tracker DCS group and Frank Glege we are elaborating a little requirements document in order to start a discussion/collaboration with the cooling people. • We would like that they choose and install the sensors, and that we take care of the read out and safety actions. G. Dissertori ETHZ

  6. ECAL Electronics, DCS Current activities... • RBFE board • Two technicians from Protvino together with the LHC-ACR group • study and test of the RBFE (Resistance Bridge Front End) board • for sensor excitation and signal conditioning before sending over long signal cable • want to combine this with a MUX --> investigations of MUX candidates (issue : radiation hardness) G. Dissertori ETHZ

  7. ECAL Electronics, DCS Current activities... • Lab test of Keithley readout system • Student from ETH together with W. Lustermann and S. Zelepoukine • study of cascaded MUXing    system •   analysis of switching time     limits ---> current limit     coming from the RBFE board •   analysis of signal precision     over long cable (120m) • test will be carried on by a    further ETH PhD student G. Dissertori ETHZ

  8. ECAL Electronics, DCS Current activities.... • Software • ETH student (Alison Lister) has started to work on software framework, as well on first PVSS set-up for the temperature monitoring • will also look into the communication with XDAQ and databases • Cabling • Serguei has started to discuss with the CMS Integration group about the cabling layout for DCS : G. Dissertori ETHZ

  9. Counting room CMS Barrel Endcap Barrel ECAL DCS cabling and front-end electronics layout Electronics ECAL Electronics, DCS G. Dissertori ETHZ

  10. 45 Keithley PC x 45 x 10 1 TMUX 45 x 10 Keithley PC x 45 TMUX 8 6 x 10 PC CAN 2 ELMB 45 x 45 Keithley PC TMUX 3 45 1 PC CAN 4 TMUX ELMB 50 m 100 m Detector Balcony Counting room ECAL Electronics, DCS G. Dissertori ETHZ

  11. ECAL Electronics, DCS Plans/Next • Irradiation tests • plan to go with a small group to PSI (end of Nov) in order to do irradation tests of the RBFE board components • SM0 integration test • we start ordering items • bring some of the M0’ setups back to B27 to be used there for those tests G. Dissertori ETHZ

  12. ECAL Electronics, DCS Conclusions • Overall good momentum • My worries • will be difficult to keep this momentum over the winter months, since the main actors will not be at CERN or be overloaded with other duties • have to well define the activities which can be carried out in the home labs • DCS for Preshower : need urgently resources • A question • has anybody in CMS in general thought about the issue of Galvanic isolation (detector - counting house) for the DCS system?? G. Dissertori ETHZ