From the field. CHINESE PARTICIPATION IN AFRICAN INFRASTRUCTURAL DEVELOPMENT: The case of the DRC and Zambia Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt Msc Prepared for the China-DAC Study Group Event on Infrastructure. - Introduction: Objectives - Methodology: LFA
E N D
From the field CHINESE PARTICIPATION IN AFRICAN INFRASTRUCTURAL DEVELOPMENT: The case of the DRC and Zambia Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt Msc Prepared for the China-DAC Study Group Event on Infrastructure
- Introduction: Objectives - Methodology: LFA - Sicomines Barter Deal - Findings from Case Studies - Conclusion Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure Overview
Introduction • Objectives • Why the DRC and Zambia? • Logical Framework Approach (LFA) Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure
Logical Framework Approach Methodology I: LFA evaluation Link between evaluation criteria and logframe matrix
Logical Framework Approach Methodology II: Case Study - DRC Project sites: inspection and interviews Kinshasa: Road Rehabilitation Project, Urban Roads, Hospital Lubumbashi: Urban Roads, Road Rehabilitation Project Interviews: Chinese Embassy EU Delegation Unité de Coordination des Projets Agence Congolese des Grands Travaux (Programme Sino-Congolais) Journalist
Logical Framework Approach Methodology III: Case Study – Zambia Project sites: Inspection and interviews Kariba North Bank Extension Project Interviews: Chinese Embassy Kariba North Bank Extension Power Corporation EU Delegation
Sicomines Barter Deal • Arisen from the needs from both receiving and investing country • Agence Congolaise de Grand Travaux (ACGT) > Programme Sino-Congolais • Structure: project selection, funding, risks Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure
Funding source and flow Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure
Introduction Case Studies Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure
Projet Travaux de Rehabilitation de la Route Nsele-Lufimi, Lot 1
Kariba South Bank (Zimbabwe) Kariba North Bank Extension Project
Conclusion • Better understanding of Chinese participation in African infrastructural development: project cycles • Misunderstanding: EU-China-DRC/Zambia > different discourses • Questions: > How could donors and recipient best cooperate? > Should Chinese stakeholders use LFA as evaluation system? > How should responsibility be divided between donors and recipient? Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure
Any Questions? Presented by Mr. Hans E. Petersen and Ms. Sanne van der Lugt MSc Prepared for the China-DAC Study Group Event on Infrastructure