Keck NGAO Project Replan: AO and Laser Systems. Donald Gavel NGAO Team Meeting 6 April 25, 2007. AO and Laser Systems Project Replan: Outline of Presentation. Program plan overview Purpose and approach of the replan Key changes highlighted
E N D
Keck NGAO Project Replan:AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007 Don Gavel: Keck NGAO meeting April 25, 2007
AO and Laser Systems Project Replan:Outline of Presentation • Program plan overview • Purpose and approach of the replan • Key changes highlighted • Feedback from the team on schedule & level of effort Don Gavel: Keck NGAO meeting April 25, 2007
AO and Laser System Program Overview • AO and Laser System Design phase follows the system engineering / trade studies phase • Inputs: Architecture Definitions, Study results, FRDs v.1 (June/July time frame) • Outputs: Contributions to System Design Manual & FRDs v.2 (= Conceptual Design or Proposal level => raising funding to build) Don Gavel: Keck NGAO meeting April 25, 2007
Purpose and Approach of the Replan • Problem: present plan is behind schedule. • Approach: given currrent status and lessons learned, adapt the plan to achieve key goals using the resources available • Play to people and institutional strengths • Streamline the work – fewer people at higher percentage • Level the plan and tie to people availability Don Gavel: Keck NGAO meeting April 25, 2007
Overview of changes in 3.2, 3.3 • WBS 3.2 AO System. • Reshuffling of personnel on four tasks. • Two new tasks: • atmospheric profiler • d-IFU & LOWFS AO & Object Selection (broken out from WBS 3.5) • WBS 3.3 Laser Facility. Reshuffling of personnel on three tasks. Don Gavel: Keck NGAO meeting April 25, 2007
Changes to 3.2, 3.3 Don Gavel: Keck NGAO meeting April 25, 2007
Program Plan Changes – 3.2 Details Don Gavel: Keck NGAO meeting April 25, 2007
Program Plan Changes – 3.3 Details Don Gavel: Keck NGAO meeting April 25, 2007
Team Feedback • WBS definitions correct and unambiguous • Objectives feasible in the time allocated • Availability, time commitment Don Gavel: Keck NGAO meeting April 25, 2007