400 likes | 422 Views
Kim Flores. Product Manager – Packaged Products. What Were They Thinking. Commercial Markets 2007 Commercial Units Jan – Aug 684,696 Units - Up 5.3%. Residential Market – Down 13.8% Project Types Design/Build Projects Contractor will design and install the HVAC system.
E N D
Kim Flores Product Manager – Packaged Products
What Were They Thinking • Commercial Markets • 2007 Commercial Units • Jan – Aug 684,696 Units - Up 5.3%. • Residential Market – Down 13.8% • Project Types • Design/Build Projects • Contractor will design and install the HVAC system. • Plan and Spec Projects • Architects develop the plans and specifications for the HVAC System. • Replacement • Service contractor replaces existing unit.
What Were They Thinking • What were we thinking? • Efficiency SEER and EER < 65,000 Btuh • ASHRAE 90.1 adopted the 13 SEER/7.7 HSPF standard for the 3-phase products less than 65,000 Btu/h. • The Department of Energy (DOE) has not yet adopted the 13 SEER/7.7 HSPF standard as a Federal standard. • The Federal standard for the 3-phase products is still at 10 SEER. June 16, 2008 the Federal Standard will be 13 SEER.
What Were They Thinking • What were we thinking? • Efficiency SEER and EER < 65,000 Btuh 3, 4 & 5 Ton Units = 13 SEER 11.3 EER 7.7 HSPF
What Were They Thinking • What were we thinking? • Efficiency EER > 65,000 Btuh’s 6 – 10 Tons = 11.5 EER / 3.4 COP 12.5 – 15 Tons = 11.5 EER / 3.2 COP 20 & 25 Tons = 10.5 EER
What Were They Thinking • January 1, 2010, R-410A
Light Commercial Products • G/E and AC 3 -25 Tons • Heat Pump 3 – 15 Tons • Fully Convertible • 208v 1 & 3 Phase • 460 v 3 Phase • 575 v 3 Phase
Light Commercial Design Review • Multi-position Gas Electric & Air Conditioning • 3,4, 5 Tons – 13 SEER/11.3 EER • 208, 1 & 3, 460, & 575v – 3 Phase • 6 Tons – 11.5 EER • 208, 460, & 575v – 3 Phase • Direct Drive (3,4 & 5 ton) • Belt Drive (6 Ton)
Light Commercial Design Review • Multi-position Gas Electric & Air Conditioning • 7.5, 8.5,10,12.5 & 15 Tons - 11.5 EER • 208, 460, & 575 - 3 phase • Two-stage Cooling • Two-stage Heating • Belt Drive
Light Commercial Design Review • Multi-position Gas Electric & Air Conditioning • 20 & 25 Tons – 10.5 EER • 208, 460, & 575v – 3 Phase • Two-stage Cooling • Two-stage Heating • Belt Drive
Light Commercial Design Review • Multi-position Gas Electric & Air Conditioning • 3 – 25 Tons • R-410A • Tubular Heat Exchanger • Contactor with lugs • Full Perimeter Rail • Bottom Utility Entry • Standard 2” Filters • Easy to Service • Single Point Entry • 24v Terminal Strip • Filter Drier • Warranty • 5 Year Parts • 20 Year Heat Exchanger
Light Commercial Design Review • Multi-position Heat Pump • 3,4, 5 Tons - 13 SEER/11.3 EER, 7.7 HSPF • 208v 1 & 3, 460v & 575v – 3 Phase • 6 Tons – 11.5 EER, 3.4 COP • 208, 460 & 575v – 3 Phase • Direct Drive (3,4 & 5 ton) • Belt Drive (6 Ton)
Light Commercial Design Review • Multi-position Heat Pump • 7.5, 8.5 & 10 Tons – 11.5 EER/3.4 COP • 208, 460, & 575 - 3 phase • Two-stage cooling • Belt Drive
Light Commercial Design Review • Multi-position Heat Pump • 12.5 & 15 Tons – 11.5 EER/3.2 COP • 208, 460, & 575v – 3 Phase • Two-stage Cooling • Belt Drive
Light Commercial Design Review • Multi-position Heat Pump • 3 – 15 Tons • R-410A • Contactor with lugs • Full Perimeter Rail • Bottom Utility Entry • Standard 2” Filters • Easy to Service • Single Point Entry • 24v Terminal Strip • Filter Drier • Warranty • 5 Year Parts
Packaged Unit Accessories • Accessories
Packaged Unit Accessories Economizer
Packaged Unit Accessories Units are prewired for the installation of motorized fresh air dampers and economizers
Launch RVP RVP Launch • 5 • HP • AC • GE • 3,7.5, 4, 10 • HP • AC • GE • 15, 20 & 25 • HP (15) • AC • GE • 6, 8.5 & 12.5 • HP • AC • GE Product Launch Roadmap January December 2008 Product Launches Product Design Period January April/May Sept - Dec May-Aug