An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WHO PERFORMS ALLOY CHAIN INSPECTIONS & HOW OFTEN?

  2. INTRODUCTION  It is the only Chain grade recommended option used in overhead lifting equipment, alloy chain slings, and binder too. Alloy steel, Heat treated 25% stronger than Grade 80 Alloy Chain.  Alloy chain inspect and document at a minimum of 12- months of periods.  All inspection should be performed by an inspection expert who can identify the problems and what steps needs to be taken to prevent any hazard.

  3. FIRST INSPECTION:  First inspect the chain after receiving it manufacturer important. from is the very  Cross-check ensure ordered and that the ratings meet all of characteristic requirements. the tag to that what you your and project lifting

  4. FREQUENT:  Hire an expert to perform a regular investigation defects and other issues on joints and fastenings. optical damage, of  Shock loads, severe angles, edges and excessive heat can quickly Chain sling, necessary to do a visual inspection change or in lifting Uses. damage so a is it before shift

  5. AT FIX PERIOD:  This professional Technician.  Factors that matters in inspection at Fix timing: Multiple time uses The badness of service conditions Nature of the performed Experience gained on the service life of wire rope slings used in similar applications Inspection is done by a 1. 2. lifts being 3. 4.