It is the only Chain grade recommended option used in overhead lifting equipment, alloy chain slings, and binder too. Alloy steel, Heat treated 25% stronger than Grade 80 Alloy Chain. Alloy chain inspects and document at a minimum of 12- months of periods. All inspections should be performed by an inspection expert who can identify the problems and what steps need to be taken to prevent any hazard.

Download Presentation

Why and how often alloy chain should be inspected

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. why and how often alloy chain should be inspected?

  2. introduction • It is the only Chain grade recommended option used in overhead lifting equipment, alloy chain slings, and binder too. Alloy steel, Heat treated 25% stronger than Grade 80 Alloy Chain. • Alloy chain inspect and document at a minimum of 12- months of periods. • All inspection should be performed by an inspection expert who can identify the problems and what steps needs to be taken to prevent any hazard.

  3. first inspection: • First inspect the chain after receiving it from the manufacturer is very important. • Cross-check the tag to ensure that what you ordered and that the ratings meet all of your project characteristic and lifting requirements.

  4. frequent: • Hire an expert to perform a regular optical investigation of damage, defects and other issues on joints and fastenings. • Shock loads, severe angles, edges and excessive heat can quickly damage a Chain sling, so it is necessary to do a visual inspection before shift change or in lifting Uses.

  5. at fix period: • This Inspection is done by a professional Technician. • Factors that matters in inspection at Fix timing: • Multiple time uses • The badness of service conditions • Nature of the lifts being performed • Experience gained on the service life of wire rope slings used in similar applications