620 likes | 744 Views
WELCOME TO. WELCOME TO. Factory Landscape and Place. Year of Establishment 200 3 Land Area 70 0 ,000 sqf Work Shop 400,000 sqf Warehouse Area 70, 000 sqf
E N D
Factory Landscape and Place • Year of Establishment 2003 • Land Area 700,000 sqf • Work Shop 400,000 sqf • Warehouse Area 70,000 sqf • NO. of employees 800 people
Capacity: US$3,000,000 ( 200 containers)/month • Short Term Plans: High-end Furniture Project • Main Strength of the Product Category- Dining tables and chairs Counter stools, Barstools,Swivel stools Cabinet , Small chests, Occasional tables Upholster furniture, Kids’furniture, Bed room.
Export Market Most of our products have been sold successfully into the North-American market, proving the adaptability in quality and style. Our sale volume of the USA market mounts to 90%, 5% of it are consumed by the Canadian furniture buyers. The remaining 5% are exported to Europe (UK).
Our Strategic Characteristics • High Quality Furniture. • Reasonable Price. • On-time delivery. • Comfortable workingplace.
Factory Layout • Overall Area: 700.000 Sqf • Work Shop : 400,000 Sqf • 6 Main factory and 1 Canteen • Warehouse Area: 70,000 Sqf • Warehouse Meterial: 20,000 • Warehouse Products: 50,000 • 1 Showroom • 1 Office building
Showroom Main Showroom
Main Products Dining Set
Main Products Dining Set
Main Products Dining Set
Main Products Counter/Bar Stool
Main Products Occasional
Main Products Occasional
Main Products Bedroom
Main Products Bedroom
Materials and Planning Department • Making plan for production and export. • Control and maintain production line. • Seek and Supply materials • Checking for container loading
Technical Department • Designer, drawing CAD, Assembly Introductions. • Display production details for products • Set up new technology. • Making new sample
Technical Department Pre-production Meeting
- Numbers of QC staff is 24. Divided in 2 teams • - Team 1: checking in line according to AQL standard level 2. • - Team 2: checking 100% finished • goods and package. • - 1 group for checking come in products. QC Department
QC staff in line • Checking in line white body • Checking in line Staining
Finishing Factorys F 1 Finish Line Factory 1: 2 Hanging line include 950 meters long with 7Sprayboots and 1 auto boot. Factory 5: - Hanging line include 1655 meters long with 6Sprayboots and 4 Auto Boots - Pallete line with 850 meters long. It’s for the table tops and some big components. Pallet line F 5
Loading lot Loading lot 1: Can load 6 cont’ in one time Loading lot 2: Can load 16 cont’ in one time
Support Activities - Security Registering visitors Checking in-coming trucks