A Unique Approach to Corridor Planning

A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study. A Unique Approach to Corridor Planning. Acknowledgements. Co-Authors – Dale Anderson, Karen Comings, Trevor Howard – Entranco, Inc. Len Bettess – Quantm, Inc. Jason Brinkman - ITD.

ronda
Download Presentation

A Unique Approach to Corridor Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study A Unique Approach to Corridor Planning

  2. Acknowledgements Co-Authors – Dale Anderson, Karen Comings, Trevor Howard – Entranco, Inc. Len Bettess – Quantm, Inc. Jason Brinkman - ITD

  3. What are our presentation objectives? • Discuss challenges – Highway Corridor Planning for NEPA Compliance • Present unique approach using Quantm and GIS • Describe solutions • Provide model for future NEPA work

  4. What is purpose of Bypass? • Construct safe, economical, and environmentally acceptable highway around Goose Creek Canyon. • Why? • Narrow 22-foot wide roadway • Steep 7 percent grades • Shaded areas - frequent icing • Poor curvature, low driving speeds, • Inadequate passing opportunities.

  5. What is the Highway Environmental Process?

  6. What are challenges of the Highway Environmental Process? • Previously studied highway alternatives • Evaluate the existing highway upgrade comparably to new highway alternatives • Consider other highway alternatives with dollar and time limitations

  7. What are challenges of the Highway Environmental Process? • Gain the trust and confidence of the citizens and resource agencies • Obtain concurrence on highway alternatives screening • Agree on how much data is enough to make a screening decision

  8. What is Quantm? • Provides a highway planning, computer-based optimization tool • Helps locate highway alternatives • Meets pre-determined engineering & environmental criteria • Staff training and support

  9. Highway profile – cut and fills

  10. Engineering criteria defined within the Quantm system

  11. Quantities and Costs for Alternatives

  12. How was Quantm Applied to the Goose Creek Project? • Develop GIS data base • Linear Features - Roads, Railroads, Utility Network (power lines and power transfer stations), Streams, Nordic and Snowmobile Trails • Special Zones - Wetlands, Lakes, northern Idaho ground squirrel habitat (surveys from the recovery team field work), bald eagle habitat, cultural areas, public land, 4(f) recreational property and historic property, private land, and land use • Additional Data - Geologic Zones

  13. Baseline highway alternatives – no environmental constraints

  14. Avoidance of environmental constraints

  15. Changing roadway design – 2 to 3 lanes

  16. Establishing highway corridors – Quantm generates array of alternatives

  17. Establishing highway corridors – Quantm generates array of alternatives

  18. Establishing highway corridors – variable width corridor for detailed environmental inventory

  19. How did our approach address challenges? • Previously studied highway alternatives? Imported into Quantm – compared on equal basis for engineering and environmental • Evaluate the existing highway upgrade? – Optimization for canyon route – not cost effective to meet design standards • Other alternatives with dollar and time limitations? Used existing GIS data, established design criteria, looked at new alignment within days

  20. How did our approach address challenges? • Gain the trust and confidence of the citizens and resource agencies? Timely results for skeptical stakeholders – objective – costs and environmental impacts • Obtain concurrence on screening? Collaborate with stakeholders through workshops – demonstrate Quantm attributes – work through alternatives together • How much data is enough to make a screening decision? Agree on data needs for screening and corridor inventories – maintain flexibility – provide clear documentation

  21. Where should we go from here? • Established highway corridor planning / environmental / engineering process • Establish highway corridors • Selects alternatives • Complies with NEPA • Addresses challenges – objective, cost-effective – quicker • We believe – it is worth repeating in Idaho