The old Schiestlhaus - 120 years old and in a very bad condition.
Alpine “island location“ Extremeclimate Detailedplanning PASSIVE HOUSE Transportation of prefabriced elements Solarenergy ECOLOGIC OVERALL CONCEPT
HOT WATER SUPPLY HEATING AND VENTILATION Passive-house ventilation system with heat recovery Hybrid thermal system with solar energy and internal heat sources
ELECTRIC POWER SUPPLY WITH PHOTOVOLTAIC SYSTEM WATER SUPPLY ( RAIN WATER) AND BIOLOGICAL WASTE WATER SYSTEM Solarstrom: Photovoltaikanlage mit 8 kWp
SCHEDULE OF DEVELOPING PROCESS 1999-2000 Project at Technical University Vienna 2000-2002 Research Project „HausderZukunft“ 2001-2002 Fundraising for the Realisation as „new Schiestlhaus“ May 2003 Implementation planning Jan. 2004 Contracts for building works Mai 2004 Start of construction Sep. 2004 Building envelope finished Sep. 2005 Completation of building, opening
PROJECT PARTNERS Architectssolar4alpin (Rezac - Stieldorf – Oettl – Treberspurg) pos architekten ZT KEG (Planung) Treberspurg & Partner Architekten ZT GmbH.(AVA + ÖBA) Consultancy building physics: Wilhelm Hofbauer, Karin Stieldorf, IBO, Wien. structural engineers: Robert Salzer, Hohenberg; Gerald Gallasch, Wien. building services: e+c Wimmer, Vöcklabruck. photovoltaics, electrical engineers: ATB Becker, Absam. waste water treatment: TB Steinbacher, Thalgau. lightening design: Klaus Pokorny, Wien.
determining factors for the building : • construction site without any road access or electric supply • Complex supply system for the construction site, very basic accomodation standard for workers, difficult crew management according to instable weather, • High demand on management and logistics • extreme climatequick weather changing, extreme temperatures, strong winds (up to 200km/h!) • special requirements in consequence of passive house standards • Dense building envelope, tight tolerances of construction (prefabrication)! • location in a nature and water protection areademands special attend to a „clean construction site (the main water supply pipeline for Vienna comes from the Hochschwab mountain!)
building site architects and consultancy implementing companies helicopter base
May 2004: Transportation of building site equipment blasting of excavation 03th of june 2004
Basement walls in concrete June / July 2004 Foundation slab June 2004
CONCRETE FACTORY CONCRETE TO APPROACH min. 3,0h HELICOPTER BASEZell am See FLIGHT TIME 3 Minutes HELICOPTER APPROACH 45 Min.
BASEMENT CEILING SLAB July 2004 Reinforcement of the slab (slab thickness only 14 cm – to save flight weight)Working at temperatures of about 3°C
Prefabrication of timber-frame elementsat the carpentry June/July 2004
Mounting of the ground floor wall elements by helicopter August 2004
…. the first wood frame elements … …. ground floor … …. frames of second floor walls…
Details of the wall-elements: Joints of elements with pre-mounted air sealing and vapor barrier foils
Mounting of all 15 roof elements within only a few minutes:requires maximum concentration of carpenters and helicopter pilot Maximum weight of roof elements: 900kg(including thermal insulation) Roof assembling September 2004
Mounting of windows and doors August / September 2004 Passive-House Windows (Wood/ Aluminium) U-Value: 0,71W/m2K Triple-Glazed Requires pressure equalisation due to transport from 600m to 2154m above sea level
Assembling of the terrace steal construction September 2004
thermal separation of the metal facade from the concrete wall
thermal solar collectors integrated into the south facade
Combined heat and power unit (runs with biologic rape-oil)
First results of measurements(Pilz Umwelttechnik & Ingenieurbüro W. Hofbauer)
completion of the interior and mounting of furniture Summer 2005
Webcam foto October 2005 Opening ceremony 2005 sept. 2nd
snow covers windows on the east-, north- and westfacade JANUARY 2006 view from south east snow on the south balcony
Exhaust ventilator of the kitchen and radiation measurement units on the roof view from the north east january 2006 snow and ice covering as additional thermal insulation