1 / 8

Changing Schedule Items

The response redesign in SERFF 5.6 introduces inline schedule item editing, allowing users to make additions and revisions directly on the schedules. This guide explains how to change schedule items and provides tips for a smooth editing process.

rosalindj
Download Presentation

Changing Schedule Items

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Changing Schedule Items Last Updated 01.31.2009

  2. Inline Schedule Item Editing Changing Schedule Items The response redesign in SERFF 5.6 introduces the concept of inline schedule item editing.  Rather than starting with the Response Letter, the user will start by making their schedule item changes directly on the schedules.  • Revisions and additions can be made to the Form, Rate/Rule, and Supporting Documentation schedules.  • Please note that on the Rate/Rule schedule, only schedule item data may be added or revised.  The rate data is not currently revisable and may not be added if omitted on the original submission.

  3. To begin the process of adding and revising schedule items, click the "Change Schedule Items" button near the top of the filing. Changing Schedule Items The filing will be put into "Revise" mode.  The three schedule item tabs and the Correspondence tab will be displayed.  The schedule item tabs are the only areas that may be changed during this process. From here, the user may make additions or revisions.  Note:  It is recommended that all schedule items changes be made before creating the Response Letter.

  4. If you are making a change to something you have already submitted, you will want to revise that item. Click the "Revise" button next to the item you wish to change.  Changing Schedule Items SERFF will create a copy of that item to which you can make your changes. If an attachment is changing, be sure to remove the old version by click the remove link next to the attachment name. You may then add the new version of the attachment.  If a schedule item has multiple attachments, only remove and replace the ones that are changing. Click here to revise this schedule item.

  5. SERFF will create a copy of that item to which you can make your changes. Changing Schedule Items If an attachment is changing, be sure to remove the old version by click the remove link next to the attachment name. You may then add the new version of the attachment.  If a schedule item has multiple attachments, only remove and replace the ones that are changing. Click Here to revise this schedule item.

  6. If you are sending something not included with the original submission, you will want to add a schedule item. Click the "Add Schedule Item(s)" button near the bottom of the page on the schedule tab to which the item should be added.  Changing Schedule Items SERFF will create a copy of that item to which you can make your changes. If an attachment is changing, be sure to remove the old version by click the remove link next to the attachment name. You may then add the new version of the attachment.  If a schedule item has multiple attachments, only remove and replace the ones that are changing. Note that on the Supporting Document schedule, the button says "Add Supporting Document." Click here to add a new schedule item.

  7. SERFF will provide a blank line for you to complete.  Changing Schedule Items Be sure to upload any attachments that belong with this new schedule item.  Click Here to revise this schedule item.

  8. Other Tips Changing Schedule Items • Try  to make all schedule item revisions and additions before creating a Response Letter. • Schedule items can be revised even if they do not have an Objection from a state. • If the schedule item has an Objection icon, the icon will not disappear until the Response Letter is submitted. • If you've revised or added a schedule item, then wish to discard those changes, click the "Undo Draft" button.  This may be done as long as the changes are in a draft status.  Once submitted to the state, the changes are a permanent part of the filing. Schedule items can be revised even if they do not have an Objection from a state. • Use the Apply button to save changes as you go.  Hit Save when you are done to exit Revise mode. Click Here to revise this schedule item.

More Related