1 / 6

TFS Science Support & Maintenance report

Explore the highlights of the TFS maintenance report, including the new efficient garage setup, equipment upgrades, and support for various science projects. Learn about fuel and power savings, facility enhancements, and ongoing maintenance projects.

rosaz
Download Presentation

TFS Science Support & Maintenance report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TFSScience Support & Maintenance report

  2. TFS Maintenance Highlights • New Garage! • Improved camp fuel and power efficiency by consolidating many uses to one building • Warm storage moved to Garage, Dry Lab shut down. • All equipment maintenance moved to Garage, no heat usage in Tire Shop, Tool Trailer, Loader Tent, Snowmachine / Bike shop. • Garage primarily runs off of waste heat from generators, with other buildings shut down it saved 562 gallons of heating oil this quarter • Net power usage increased by 1936 KW/Hr, converts to 161 gallons of fuel for a total net savings of 401 gallons of fuel • Allows for detailed winter maintenance of equipment • Most maintenance & science support equipment based out of one building and nearby Connex – tools, generators, augers, snowmachines, etc.

  3. TFS Maintenance Highlights • Dalton Hwy flooding and closure a major but successful challenge to camp maintenance, primarily waste water evacuation • Fiber upgrade – Winter Lab, GIS, Well House, Lab 4, Dry Lab, Wet Lab, D-shack B, and Lab 6 & 7 are now on a fiber optic backhaul, eliminating the wireless bottleneck • Addition to Health Club building • Additional square footage allows for weight room, treadmill, elliptical, and flexible floor space • Propane fired heating system replaced electric heat, saving 3000 KW/Hrs. Equals 250 gallons of fuel, which is how much propane we used this quarter to heat roughly three times the square footage • New commercial duty treadmill and elliptical • New science truck and leased UAF stakebed truck.

  4. TFS Science Support Highlights • Did we mention the garage? • Increasing demand for snowmachines and augers during the spring season, adding to the fleet as funding allows • Off season support for autonomous and overwintering projects remains abundant • Support for Obrist/Helmig, MacIntyre, Conde, AON, Deegan, Hampton, Stanford, Georgia Tech, and more. 84 winter requests for 18 different funded projects • Upgraded boat docks – dock repair and reconfiguration for easier docking and better weather protection • Usual suite of summer season science support projects – including fabrication, field support, technical support, and equipment repair. 216 summer requests for 51 different funded projects

  5. TFSScience Support & Maintenance Questions?

More Related