Software Quality Management

Software Quality Management. Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst. Agenda. review risk based V & V software & systems criticality criticality analysis & risk assessment (CARA) method impact & risk driver categories & values CARA steps

Download Presentation

Software Quality Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst LECTURE 11-2005

  2. Agenda • review • risk based V & V • software & systems criticality • criticality analysis & risk assessment (CARA) method • impact & risk driver categories & values • CARA steps • CARA implementation recommendations • CARA benefits LECTURE 11-2005

  3. Review • many software projects fail to meet objectives • lack of objective quality evidence is common • a complex solution requires significant test planning and management effort and a complex set of testing activities • complete testing is usually not possible • testing should be focused on assisting with evaluation of the success of the project and the ‘quality’ of the delivered solution…. LECTURE 11-2005

  4. Risk based V & V • Risk = probability of occurrence x impact • V & V is primarily a risk management activity • risks can be associated with both product & processes • high impact elements are critical elements • V & V is aimed at reducing or eliminating uncertainty by the provision of evidence of the capability & quality of software & systems • V & V on all software is not necessary or financially feasible • risk based V & V is a targeted activity…. LECTURE 11-2005

  5. Software & systems criticality • Criticality is a measure of the impact of errors on: • system performance and operations • safety / security • cost & schedule • Risk is a measure of the likelihood of errors based on: • complexity • maturity of technology • requirements definition & stability • testability • developer experience…. LECTURE 11-2005

  6. The Criticality Analysis & Risk Assessment (CARA) method • CARA is a formalised methodology which evolved from a US Air Force V & V initiative. • CARA provides a systematic procedure for rank ordering development program elements with respect to well defined scoring factors associated with criticality & risks drivers • CARA is a means for evaluating the risk exposure for software or systems and sizing the V & V effort • CARA has been applied to space systems including : • space shuttle software and critical mission support software • space station flight software…. LECTURE 11-2005

  7. The criticality & risk driver categories & values • error impact categories & values • Catastrophic (4) • Critical (3) • Marginal (2) • Negligible (1) • risk driver categories & values • Complexity (high=3, moderate=2, low =1) • Maturity of technology (high=3, moderate=2, low =1) • Requirements definition & stability (high=3, moderate=2, low=1) • Testability (high=3, moderate=2, low=1)…. refer tables 14.3 & 14.4 LECTURE 11-2005

  8. The criticality categories & values LECTURE 11-2005

  9. The risk driver categories & values LECTURE 11-2005

  10. CARA steps • Step 1: Identify software functions • Step 2: Establish the evaluation team • Step 3: Develop the CARA evaluation criteria • Step 4: Perform criticality analysis & risk assessment • Step 5: Set V&V analysis level (VAL) thresholds • Step 6: Estimate software size • Step 7: Generate V&V effort estimates • Step 8: Evaluate effort estimate results • Step 9: Revise V&V scope…. LECTURE 11-2005

  11. Step 1: Identify software functions • Collect systems information (from CONOPS,specs, business cases) • Identify the required software capabilities (functions and performance) • Build a scoring matrix • A solution decomposition/ PBS based structure is useful • Values may be assigned at any appropriate level of abstraction (requirements, requirements groups, components, sub systems, etc) • Identify related systems domains / areas of specialisation…. LECTURE 11-2005

  12. Step 2: Establish the evaluation team • Engage system domain experts • Engage development process experts • Establish management team & processes…. LECTURE 11-2005

  13. Step 3: Develop the CARA evaluation criteria • Collect evaluation criteria from similar domains • Develop an understanding of the mission the system is to perform • Tailor criticality evaluation criteria in terms of what is catastrophic, critical, or of moderate impact to users, customers, and acquirers of the system • Tailor risk evaluation criteria ( by inclusion of additional drivers) • Identify criticality area or risk driver weightings, if necessary • Review criteria with the customer…. LECTURE 11-2005

  14. Step 4: Perform criticality analysis & risk assessment • Perform criticality analysis • consider the systems components, their interactions, failure modes & effects, and concepts of operations • rate the functions according to criteria and scoring rationale • Perform risk analysis • review software & system development, test and verification plans • review development methods, testing approach, reuse plans, organisational interfaces, integration requirements, risks & risk mitigation techniques • rate the functions according to criteria and scoring rationale • Calculate CARA scores (n = Criticality[xW] x Risk[xW]) • Rank elements in score order…. LECTURE 11-2005

  15. Step 5: Set V&V analysis level (VAL) thresholds • Functions with higher CARA scores receive higher VALs • Example VAL thresholds: CARA scoreVAL 1<CARA<2 None 2<CARA<5 Limited 5<CARA<8 Focused 8<CARA<12 Comprehensive e.g. 1: Safety impact of 4, complexity risk of 3, n = 12 (unweighted) e.g. 2: Cost impact of 1, maturity risk of 2, n = 2 (unweighted)…. LECTURE 11-2005

  16. Step 6: Estimate software size • This step can be performed anytime before step 7 • The size measurement is the V & V workload: V&V work = f (no. of requirements, external interfaces, output products) • An alternative size measure is the developer software size estimate (e.g. SLOC) LECTURE 11-2005

  17. Step 7: Generate V & V effort estimates (including an independent V & V effort estimate) • Apply V&V productivity factors to size estimates (these may vary according to VALs, software complexity & size, development methods, development types (initial production, block update), domains, developer maturity and experience, V&V agent experience) • Apply program project management (schedule and effort estimation) standards & conventions …. LECTURE 11-2005

  18. Step 8: Evaluate effort estimate results • Review the results with the customer • If the prescribed VALs for the software functions and associated costs are acceptable, generate the critical functions list (this defines the V&V scope and priorities) …. LECTURE 11-2005

  19. Step 9: Revise V&V scope • If the results are not acceptable, use the independent V&V estimate to re-scope the effort • VAL threshold adjustments may be used to aid breadth v. depth tradeoffs • VAL selective exceptions/adjustments may be used e.g. for safety critical functions with a score of 3 or more - apply focused V&V (instead of limited) .... LECTURE 11-2005

  20. CARA implementation recommendations • CARA scoring must be done by domain experts • CARA scoring must be done in a peer review environment • Project management should participate in scoring activities • CARA training should be done with all personnel • Automation tools are necessary for large projects • Capturing the scoring rationale is important • CARA should be repeated at least once every major development milestone…. LECTURE 11-2005

  21. CARA benefits • The results can be used to support V&V planning & management : • assessment of overall and relative risks • allocation of fixed resources across a set of V&V objectives and tasks • assessment of the need for future V&V resources • establishing V&V importance levels / focus points/ priorities • prioritisation of items for work sequencing • CARA establishes a structured approach to V&V which increased customer visibility into risk, risk mitigation and V&V activities…. LECTURE 11-2005

  22. Review • V & V is primarily a risk management activity • V & V on all software is not necessary or financially feasible • Risk based V & V is a targeted activity • The criticality analysis & risk assessment (CARA) method may be used to analyse, plan and justify a structured risk based V & V program LECTURE 11-2005

  23. References • Sommerville edition 7: • chapter 20: Critical Systems Development • chapter 24: Critical Systems Validation • handout: Determining the Required Level of IV&V Program [Boughton] • Marvin V. Zelkowitz and Iona Rus,Understanding IV & V in a safety critical and complex evolutionary environment: the NASA space shuttle program, ICSE 23 (23rd International Conference on Software Engineering) p 349-357, 2001, IEEE Computer Society LECTURE 11-2005