1 / 34

ekuuh; ea=h egksn; dks izLrqfrdj.k

ekuuh; ea=h egksn; dks izLrqfrdj.k. jktLFkku dk jksM usVodZ As on 31.3.2013. isp ejEer gsrq ctV izko / kku & :- 213 djksM + foÙkh ; o"kZ 2013&14 esa lEHkkfor O;; & :- 325 djksM vfrfjDRk ctV dh vko';drk & :- 112 djksM. 1.

rowdy
Download Presentation

ekuuh; ea=h egksn; dks izLrqfrdj.k

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ekuuh; ea=h egksn; dks izLrqfrdj.k

  2. jktLFkku dk jksM usVodZAs on 31.3.2013 ispejEergsrqctVizko/kku & :- 213 djksM+ foÙkh; o"kZ 2013&14 esalEHkkfor O;; & :- 325 djksM vfrfjDRkctV dh vko';drk & :- 112 djksM 1

  3. Ikapo"khZ; ;kstukvksa esa lM+d fuekZ.k dh izxfr 2

  4. jkT; ;kstuk en esas Lohd`r lM+d dk;ksZ dk fooj.k 3

  5. jkT; ;kstuk en esas Lohd`r lM+d dk;ksZ dk fooj.k 4

  6. ukckMZ }kjk foRr iksf"kr vkj-vkbZ-Mh-,Q- ;kstuk 5

  7. rsjgoka foÙk vk;ksx ds vUrxZr dk;ksZ dk fooj.k rsjgoka foÙk vk;ksx ds vUrxZr ;kstuk en esa LVsV gkbZos ,oa ,e-Mh-vkj- ds Lohd`r dk;Z rsjgoka foÙk vk;ksx ds vUrxZr xSj ;kstuk en esa Lohd`r dk;Z 6

  8. Status of 16 Megha highway Projects 7

  9. NH (PPP) Projects Under Implementation 8

  10. eq[;ea=h ctV ?kks"k.kk 2013&14 esa izLrkfor ch-vks-Vh- ifj;kstuk dk izxfr fooj.k 9

  11. PMGSY SANCTIONS 10

  12. PMGSY Progress -Target-Achievements 11

  13. Project Under Pipeline(DPR Submission Status) 12

  14. eq[; enokjHkoudk;ksZ dh HkkSfrd ,oafofÙk; izxfr ¼o"kZ 2008&09 ls½ ¼:- djksMks+ esa½ 13

  15. o"kZ 2003 ls 2008 ,oa 2008 ls 2013 rd xSj vk;kstuk ,oa vk;kstuk O;; dk rqyukRed fooj.k ¼:- djksMks+ esa½ 14

  16. fjMdksjdkxBu • jktLFkku ljdkj us izns’k esa vk/kkjHkwr lajpuk ds fuekZ.k gsrq fjMdksj dk xBu o"kZ 2005 esa jkT; ljdkj ,oa vkbZ,y,.M,Q,l ds lkfu/; esa 50%50 izfr’kr dh lgHkkfxrk ds vk/kkj ij fd;k x;k FkkA 15

  17. jkT; ljdkj }kjklg;ksx ¼jkf'k djksM+ksa esa½ • jkT; ljdkj }kjk iquHkZj.k ;ksX; fuosf’kr _.k ds cnys yxHkx 7 xquk vf/kd dh ykxr dh yEckbZ dh lM+dksa dh lqfo/kk izkIr gqbZ gSA • jkT; ljdkj }kjk dksbZ xkj.Vh ugha nh xbZ gSA • jkT; ljdkj }kjk fn;s x;s _.k dk fjMdksj }kjk iquHkqZxrku fd;k tk;sxkA • izFke ,oa f}rh; pj.k dk dk;Z i.kZ dj fy;k x;k gSA • r`rh; pj.k ds dk;ksaZ gsrq foÙkh; izca/ku dh dk;Zokgh izfØ;k/khu gSA 16 17

  18. fjMdksj dk;ksaZ dk izxfr fooj.k & izFke ,oa f}rh; pj.k izFke pj.k ¼2006&2008½ f}rh; pj.k ¼2008&2013½ 17

  19. fjMdksj dk;ksaZ dk izxfr fooj.k & r`rh; pj.k ¼2013&14½ ¼djksM+ksa esa½ 18

  20. Major Issues On Which Decision Are Required To Be Taken At Higher Levels • Budget Provision for NABARD Assistance Scheme RIDF XVIII is 600 Cr is available but Budget Provision of Rs. 800 Cr. required. • The works of Rs. 800 Cr. have been sanctioned under RIDF XIX & Budget Provision of Rs.175 Cr is available for this financial year, but revised Budget provision of Rs. 500 Cr required. • The work under Special Priority sanctioned for Rs.550 Cr. & works for Rs.100 Cr. awarded & remaining works of Rs.450 Cr. could not awarded due to Model code of conduct. Now permission is required for awarding remaining works of Rs. 450 Cr. • The works of Rs 434.87 Cr were sanctioned for Connectivity of villages having population (100-249) based on Census-2001 & works of Rs. 220.00 Cr were sanctioned for Connectivity of revenue villages newly declared after Census-2001, but tender could not be awarded. Now permission is required for awarding these works. • The Budget Provision in Plan (Rural Roads) is Rs.208 Cr and works are sanctioned of Rs. 1300 Cr. If all works are kept in progress, then revised Budget of Rs. 555.78 Cr will be required. Therefore to keep all the works in Progress Plan ceiling is required to be increased upto Rs. 3750 Cr. against present plan ceiling of Rs. 2567.22 Cr. 19

  21. Status of points of additional agenda (Chief Secretary Note sheet dated 18.12.13) 20

  22. RSRDCC Action Plan for On-going BOT Road Projects (Rs. in Cr.) (Rs. in Cr.) 21

  23. RSRDCC Action Plan for On-going ROB Projects (Rs. In lacs) 22

  24. RSRDCC Action Plan for On-going Building Projects (Rs. in Crs.) 23

  25. RSRDCC Major Issues 24

  26. RSRDCC Status of Major Projects, initiated between 2003-08 and remained incomplete in Dec.,2008 25

  27. RSRDCC Status of Major Projects, initiated between 2003-08 and remained incomplete in Dec.,2008 Continued…. 26

  28. RSRDCC Status of Major Projects, initiated between 2003-08 and remained incomplete in Dec.,2008 Continued…. 27

  29. /kU;okn Success is a Journey

  30. Phase-I Project Photographs 31

  31. Phase-II Project Photographs 32

  32. Phase-II Project Photographs 33

  33. Ekkuuh; eq[;ea=h jktLFkku dks izLrqrhdj.k }kjk lkoZtfud fuekZ.k foHkkx ekuuh; eq[;ea=h egksn;k dks izLrqfrdj.k lkoZtfud fuekZ.k foHkkx

More Related