290 likes | 399 Views
Creation of an energy generating enterprise in Chernobyl zone for production of electric and heat power in the process of utilizing biomass and solid domestic waste. Project goal :
E N D
Creation of an energy generating enterprise in Chernobyl zone for production of electric and heat power in the process of utilizing biomass and solid domestic waste
Project goal: • Creation of a power generation enterprise in Chernobyl zone for production of electric and heat power with the help of utilizing biomass (wood, peat, grass vegetation) and sorted solid domestic waste of Kiev region (Kiev, Kiev region). • Solution of the environmental protection from pollution, which generated of Chernobyl Accident Consequences. • Complex solution waste management in Kiev, Kiev region, their ecologically safe utilization, reduction of spaces under land disposal and landfill.
PRODUCTION AND SALES PROGRAM • The annual volume of wood, peat, biomass and domestic waste utilization – 3,4 mln. cubic meters • Annual production of 350, 4 mln. kW/helectric power • Annual productionof 160 Gcalof heat energy
Sources of materials using for the power generation enterprise in Chernobyl Zone
Allocation Scheme of power generation enterprise in Chernobyl Zone
Selection criteria of a site of the power generating enterprise in the Chernobyl zone • Presence of a biomass stocks (wood and grassy), peat deposits, located in immediate proximity from the enterprise and sufficient for maintenance of its capacities • Presence of the stable consumer in a zone of electric (more than 35 million kw/hour) and thermal energy (160 thousand Gkal) • 3. Presence of the transport infrastructure necessary for placing and functioning of the power generating enterprise (deliveries of the equipment and transportation of a biomass and solid domestic waste)
Collection and transportation of solid domestic waste to be used as fuel for the power generation plant • (separate project) • Creation on existing landfills in Kiev and Kiev region the waste sorting and waste loading complexes with the service in radius of 25-45 km. • Fractions selection, which available as fuel for the power generation plant in CZ • Preparing of sorted SHW fractions for burning as fuel for the power generation plant • Transportation of prepared for waste fraction burning on special heavy-duty road train with trailer (waste capacity 300-350 cubic meters) to power generation plant
. The scheme of technological equipment producing electric and heat energy from biomass and sorted waste
. Equipment of power generating enterprise
Rest inActually ash EPA Barium 100 mg/l 0.37 mg/l Cadmium 1 mg/l 0.10 mg/l Plumbum 5 mg/l0.58 mg/l Arsenic 5 mg/l 0.05 mg/l Selenium 1 mg/l 0.05 mg/l Chrome 5 mg/l 0.01 mg/l 4-methyl penthanol 7 mg/l 2.0 mg/l Benzol 0.5 mg/l0.1 mg/l Benzol. N/A 170.0 mg/l Octan PhitalatN/A 4 mg/l Ash content
Emission NormActually Macron 0.080 г0.051г CO (carbon monoxide)50 ‰ 1 ‰ SO2(sulfur dioxide)150 ‰ 24 ‰ HCI (hydrogen chloride) 50 ‰ 6 ‰ NOX(nitrogen oxides) 200 ‰ 68 ‰ Levels of emissions in smoke gases at burning of alternative fuel
Infrastructure for construction and operation of power generation enterprise • A land plot with the area of 31 hectares for construction and operation of the power generation enterprise; • Buildings and structures of the administrative facility and three production workshops having the total area of 3 thou. m2, which are situated on the land plot; • Peat deposits and land plots with forested areas.
Listof licenses and permits for the project • Permit to start high-hazard operation No. 1508.06.32-40.30.0 issued to Chernobylelektro Ltd. by the territorial Department of Gospromnadzor Department in Kiev region and the city of Kiev of the State Industrial Safety, Labor Safety and Mining Supervision Department (Gospromgornadzor). • Agreement No. 3-21/09, Utilization of Biomass Contaminated with Radionuclides and Generation of Electric Power and Heat in the Restricted Zone and Mandatory Evacuation Zone, of 08.09.2006 signed between the State Department – Administration of the Restriction and Mandatory Evacuation Zone of the Ministry of Emergency Situations (MChS) of Ukraine (AZOiZBOO) and Chernobylelektro Ltd. • Order No. 125 of 07.08.07 issued by the State Specialized Enterprize – Center of Processing and Disposal of Man-Made Waste, Tekhnocenter of Radon Ukrainian State Association of MChS of Ukraine about provision of a permit to execute special 2nd category work by Chernobylelektro Ltd. • Terms of Reference for the design of an enterprise (plant) in the restricted zone for the purpose of producing electric power from non-conventional sources of materials approved by MChS of Ukraine. • Special permit No. 000397 of 11.01.2007 issued to Chernobylelektro by AZOiZBOO of MChS of Ukraine and granting the right to generate and produce electric power and heat. • License АВ No. 377783 issued by the State Nuclear Regulation Committee of Ukraine granting the right to process, utilize and disposal of radioactive waste • Subprogram “Creation of Technologies and Equipment for Utilization of Biomass and Other Radiation Polluted Materials, Land Reclamation on Their Basis in the Restricted Zone within the framework of the State Program for Mitigation of Chernobyl Accident Consequences.
. Licenses and permits for the project
Cumulative profile of project’s risks Pic 1. Cumulative index of event probability
Project sensibility to variable expenses changing Level of variable expenses, % to the planning
Project sensibility to product cost changing Cost service level
Project sensibility to the planning production volume changing Rendering service volume
. We are ready to any kind of mutually advantageous cooperation – as in the field of technological decisions and questions of financing and operation of the given project