1 / 19

Larkin Creek Phase II Project 11-1800

Larkin Creek Phase II Project 11-1800 . Jennifer L. Bouldin , PhD Ecotoxicology Research Facility Arkansas State University. Background. Larkin Creek tributary of the L’Anguille River dominated by row crop agriculture. L’Anguille River tributary of the St. Francis

rudolf
Download Presentation

Larkin Creek Phase II Project 11-1800

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Larkin Creek Phase IIProject 11-1800 Jennifer L. Bouldin, PhD Ecotoxicology Research Facility Arkansas State University

  2. Background • Larkin Creek • tributary of the L’Anguille River • dominated by row crop agriculture. • L’AnguilleRiver • tributary of the St. Francis • in the Delta ecoregion • ADEQ authorized the St. Francis County Conservation District to implement BMPs to reduce pollutant loading to L’Anguille

  3. Site description Lateral 1-A of Larkin Creek • Tributary of the L’Anguille River • HUC#080202050506 St. Francis County

  4. St. Francis County Site description

  5. Site description Lateral 1-A of Larkin Creek • Tributary of the L’Anguille River • HUC#080202050506

  6. BMPs St. Francis County Conservation District • sediment pond construction • plant riparian buffers • remove sediment • restore the channel • Lateral 1-A of Larkin Creek L’Anguille River • Agricultural activities cited as major cause of the impairment within watershed • excessive turbidity from silt, suspended solids loading, sedimentation

  7. Measured Parameters • pH • Dissolved Oxygen • Total Suspended Solids (TSS) • Turbidity • Dissolved Nitrate, Nitrite, Orthophosphate

  8. Phase IJune 1 - Sept 2010

  9. Phase IUpper Site • PO4 = bdl – 0.50 ppm • NO3 = bdl • Turbidity = 2.39 – 8.29 NTU • TSS = 5.10 – 28.67 mg/L

  10. Phase I Middle Site • PO4 = 0.04 – 0.21 ppm • NO3 = bdl • Turbidity = 2.49 – 285 NTU • TSS = 7.67 – 489.83 mg/L

  11. Phase I Lower Site • PO4 = 0.08 – 0.32 ppm • NO3 = bdl – 0.71 ppm • Turbidity = 2.49 – 5.16 NTU • TSS = 5.03 – 12.90 mg/L

  12. Phase II Upper Site Phase I

  13. Upper site 25.23 Greatest pre-implementation values PO4 - 0.50 ppm NO3 - bdl Turbidity - 8.29 NTU TSS - 28.67 mg/L

  14. Phase I Phase II Middle Site

  15. Middle site 21.56 Greatest pre-implementation values PO4 - 0.21 ppm NO3 - bdl Turbidity - 285 NTU TSS - 489 mg/L 2536 1067

  16. Phase II Lower Site Phase I

  17. Lower site 32.95 Greatest pre-implementation values PO4 - 0.24 ppm NO3- 0.71 ppm Turbidity – 5.16 NTU TSS – 12.17 mg/L 738 888

  18. Preliminary results • TSS remains highest at Middle Site • Especially following rain events • Will benefit from upstream sedimentation pond • Nutrient spikes following applications and rainfall events • Data following conservation practice implementation may show improvement over time • Data from drought year (2012) and wet year (2013) difficult to interpret

  19. Questions? Middle Larkin Creek Lower Larkin Creek Upper Larkin Creek Thanks to ANRC, Sarah Vogt, students and technicians at Ecotox

More Related