An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Triumvirate's Advisory Group Meeting: October 2008Update - PCBs in Building CaulkingPresented by: Sean Reagan, Corporate Director-Higher Education

  2. Introduction PCBs – Technical/Regulatory Issues (TSCA, Remediation/Abatement) Abatement/Remediation Challenges & Experience Managing Risk – Strategic Thinking Moving Forward PCBs in Building Materials

  3. 2000: Chafee Building, URI 2004: Herrick Report, HSPH 2004: French Hill Elementary, Yorktown Heights, NY 2005: SUNY Oswego 2006: Ben Franklin Elementary, Westchester, NY 2006: Westgate Complex, MIT 2006: Lederle Complex, UMass 2007: Pablo Casals Elementary, Bronx, NY PCBs in Building Materials – Event Timeline

  4. Policy/Regulatory Update • EPA Headquarters – Tom Simmons, PCB Policy Dev. • Fact Sheet release (Testing, Interim Measures, Disposal) • EPA Region I – Kim Tisa, PCB Coordinator • Once deterined to be greater than 50 ppm – remove, test contact materials • EPA Region II – Jim Haklar, PCB Coordinator • Encapsulation testing of affected building material appears positive – but its early • Recommends proactive approach • NYS Education Department Protocol (June 2007)

  5. CHALLENGES FOR HIGHER EDUCATION/HEALTHCARE • “To Test or Not to Test” (Parent/Public perception) • Funding remediation • Soil Contamination/Indoor Air/PCB Leaching • Waste Disposal Liability • Contractor/Student/Parent Testing • Proactive v. Reactive Approaches

  6. Strategic Considerations • Educate your key stakeholders • Review next 3-5 year renovation/new construction schedule – adjust construction budgets • Risk acceptance – test or not to test – determine facility use and exposure scenarios • Review disposal practices and requirements