An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Irradiation of SURVEY equipment Mateusz Sosin BE/ABP/SU Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  2. Summary • Active tests • WPS sensors active irradiation (5MGy) • Passive tests • ZTS actuators for CLEX (5MGy) • Switches and microswitches samples (300kGy) • MAXON MOTOR equipment: 2 motors + 2 gearboxes + 2 resolvers (300kGy) • Filling/Purging device (300kGy) • Wire displacer (300kGy) TENTATIVE Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  3. WPS sensors active irradiation (5MGy) • Active irradiation up to 5MGy • Tests specificacion depends of results of current passive irradiation (pending @ Fraunhofer) • 2 sensors and 2 cables irradiated, 1 sensor as external reference for irradiated cables • If applicable – preffered use of existing test bench (Question: Impact of dimensions of components wrt. accesible dose rate per volume of material ? Does redesign of TB needed?) Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  4. ZTS actuators for CLEX (5MGy) • Passive irradiation up to 5MGy • 4 intermediate steps: 100 kGy, 300 kGy, 1 MGy, 5 MGy • Intermediate measurements using delivered test bench Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  5. Switches and microswitches samples (300kGy) • Irradiation of market accesible switches and microswitches used in our projects (and for future projects purposes) • Amount of pieces ~30 • Dimensions of samples (length/height/width up to 50mm) Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  6. MAXON MOTOR equipment (300kGy) • Passive irradiation up to 300kGy • 2 motors + 2 resolvers + 2 gearboxes • No intermediate steps needed • Components accesible after mid July 2013 Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  7. Filling/Purging device (300kGy) - TENTATIVE • Passive irradiation up to 300kGy • 2 intermediate step: 100 kGy, 300 kGy • Intermediate measurements according to delivered procedure • Device dimensions: height ~700mm, diameter ~160mm Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013

  8. Wire displacer (500kGy) - TENTATIVE • Passive irradiation up to 300kGy • 2 intermediate steps: 100 kGy, 300 kGy • Intermediate measurements using delivered test bench Fraunhofer Radiation Test Campaigns – Discussion @ CERN, 23.05.2013