Limit Sets. Limit Sets Defined. Limit Sets - groups monitoring & reporting requirements for each Permitted Feature Limit Sets typically apply during particular operating conditions such as: Summer vs Winter High production volume vs low production volume
E N D
Limit Sets Defined • Limit Sets - groups monitoring & reporting requirements for each Permitted Feature • Limit Sets typically apply during particular operating conditions such as: • Summer vs Winter • High production volume vs low production volume • Frequency of reporting (monthly, quarterly, yearly, etc) • Limit Sets define Discharge Monitoring Reports (DMRs) • What date range will be covered on the DMR form • When the first DMR will begin • when the DMRs are due to the Agency
Limit Set Example • 001 has monthly, quarterly, and yearly requirements • Create 3 Limit Sets - For Expected DMRs and Generation of Violations Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec X X X X X X X X X X X X Monthly X X X X Quarterly X Yearly
Actual Permit Language • General Foods, Permitted Feature 001
Types of Limit Sets • There are two types of Limit Sets • Traditionally, Limit Sets are Scheduled • DMRs are expected on a predictable basis • Non-Receipt Violations are generated when 30 days late
Unscheduled Limit Sets • Special Regulatory Programs may need Unscheduled Limit Sets • DMRs are entered on an as-received basis • There is no DMR Due Date • DMR Non-Receipt Violations are never generated • Unschedule Limit Sets support the variable reporting needs of the Storm Water, Biosolids, and other programs • Appropriate for event-based reporting, rather than a continuous discharge
Expected DMRs • Using Limit Set (and Limit) data, ICIS-NPDES creates an Expected DMR Schedule • Allows users to see the expected discharge activity • Aids in validation of submitted DMR data • Scheduled Limit Sets get an Expected DMR Schedule when at least one Limit has been added to the Limit Set • Expected DMRs are created one-at-a-time as they are received for Unscheduled Limit Sets • The Expected DMR Schedule will be discussed more during the Limits and DMR units
Limit Set Decision Making • General Foods Permit • Should we set up limit sets for “Scheduled” or “Unscheduled” Limit Sets? • Do you know how often they should sample (monthly, quarterly? • Both – monthly and quarterly • are the DMRs due on a specific date? (check permit) • Yes. “no later than the 15th of the following month” • Scheduled or Unscheduled? • Scheduled
Example of Report Units • Example of an actual permit with different reporting frequencies
Limit Set Screen • The Limit Set Screen captures the following information • Limit Set Information • Limit Set Designator • Default Months Limit Set Applies • Status information • Schedule information • DMR Pre-print information • User Defined Fields • Default Statistical Base Codes
Accessing Limit Sets from Permitted Feature • From the Permitted Feature hyperlink • Limit Sets
Accessing from Limit Set Hyperlink • From the Limit Set hyperlink
Fields Required to be Entered • Permitted Feature will have to be manually entered
Limit Set Unique Data Elements • Individual Limit Sets are unique according to the following data elements • NPDES ID • Permitted Feature Identifier • Limit Set Designator (can be 1-2 characters, alphanumeric) • Users are also able to name Limit Sets; the Limit Set Name is pre-printed on DMRs
Default Months • The default is “all months” checked • The months checked on the Limit sets do not have to match the individual parameter limits • Essentially the seasons on the parameter limits will override the ones on the limit set
Default Months Seasonal • Seasonal limits (i.e. Winter/Summer) • As a data entry convenience, users may select default months that the Limit Set applies • When coding the parameter limits the months selected below will be the default for each parameter limit • Edits to Limit Set Months do not trickle down to already existing Limit Months
Limit Set and Compliance Tracking Status • Limit Set Status gives users the ability to turn a Limit Set on or off for violation generation for a period of time • Active (default) • Inactive • Like Compliance Tracking Status on the Permit, users can enter multiple Limit Set Statuses
Schedule Data Fields • Schedule Data include • Number of Report Units • Number of Submission Units • Initial Monitoring Date • Initial DMR Due Date • Modification Effective Date • Modification Type
Schedule Data Fields • Schedule Data define the monitoring and reporting requirements for a Limit Set • These fields are very important in ensuring that violations are generated accuracy and DMRs are for the correct timeframes • Invalid non-receipt violations
Actual Permit Example • Let’s enter our Limit Sets for General Foods 001 A Monthly 001 Q Quarterly
Number of Report Units • Number of Report Units • The number of months covered by the DMR form (e.g., Number of Report Units = 3 reflects quarterly, 3-month long DMRs) • Always measured in months • General Foods Permit 001 A – what is the # of Report Units? 1
Number of Submission Units • Number of Submission Units • The number of months DMR are submitted (e.g., Submission Units = 6 means submit DMR(s) every 6 months, = 3 means submit DMR(s) every 3 months • Must be greater than or equal to Number of Report Units • Must be evenly divisible by the Number of Report Units • General Foods Permit – What is the submission units? 1 1
Initial Monitoring Date • Initial Monitoring Date • The date at which monitoring begins for the Limit Set • Always begin on the 1° day of the month 1 1 07/01/2012
Initial Monitoring Date • Initial DMR Due Date • The date that the first DMR for the Limit Set is due to the regulatory authority • Must be greater than or equal to the Initial Monitoring Date + the Number of Submission Units • For example, if a DMR starts monitoring on June 1st, and Number of Submission Units = 2, the Initial DMR Due Date must be greater than or equal to August 1st 1 1 07/01/2012
Initial Monitoring Date • General Foods Initial DMR Due Date? When is the July 2012 DMR due to your Agency? 1 1 07/01/2012 08/15/2012
Initial Monitoring Date • Initial Monitoring Date (IMD) can occur before the Permit Effective Date of the permit • Business Rule - first DMR end date must be on or after the effective date of the permit • Examples for Permit Effective Date of Sept 1, 2013 Monthly DMRs start 9/1/13 (IMD = 9/1/13) Quarterly DMRs for period July – Sept (IMD = 7/1/13 or 10/1/13) Semi-Annual DMRs for July – Dec (IMD = 7/1/13 or 01/01/14) • Yearly DMR for Jan thru Dec (IMD = 1/1/2013 or1/1/2014)
Modification Fields • Original permit contains a change to the limits during the life of the permit • Referred to as modified limits • i.e. when construction is completed and plant expanded, limits will be modified to meet the new conditions • Modified permit can be issued • Original eff 7/1/2012 exp 6/30/2017 • Modified eff 4/1/2014 exp 6/30/2017
Agency Reviewer and Comment Fields • Data entered in this section will be pre-printed on all the Limit Set’s DMRs • Users can identify • Agency Reviewer • DMR Comments
User Defined Fields • User Defined Fields • Optional fields that are available for states and regions to use at their own discretion
Screen Options • Screen Options • Save and Exit • Save & Add Another • Cancel • Do we have any other Limit Sets to enter for General Foods? Yes – Choose Save & Add Another
Review Permit for Limit Sets • Let’s enter the remaining Limit Sets for General Foods • We will walk thru the quarterly limit set 001 Q • You can enter the limits set required for permitted feature INFL on your own • Verify all limit sets have been completed
Schedule for Quarterly Requirements • 001 Q – Quarterly Requirements • Number of Report Units _ • How many months on DMR form • Number of Submission Units _ • How many months submitted • Initial Monitoring Date ___________ • Initial DMR Due Date ___________
Schedule for Quarterly Requirements • 001 Q – Quarterly Requirements • Number of Report Units _ • How many months on DMR form • Number of Submission Units _ • How many months submitted • Initial Monitoring Date ___________ • Initial DMR Due Date ___________ 3 3 07/01/2012 10/15/2012
Schedule for Quarterly Requirements • Add the Limit Set for the Quarterly Requirements
Schedule for Quarterly Requirements • Fields maintained when “Save and Add Another” • What changes need to be made?
Schedule for Quarterly Requirements • The answer is….
Permit Review for Limit Sets • Enter the limits sets for the INFL permit requirements • Monthly, quarterly, semi-annual, annual requirements? • You can check your answers on the next slide
Permit Review for Limit Sets • When you complete the limit set for INFL, your screen should look like this…..
If further assistance is required please contact Your Assigned System Administrator or ICIS Customer Support at (202) 564-7756 or icis@epa.gov THANK YOU!
Expected DMRs and Violations • These data drive the Expected DMR Schedule and calculations of DMR Non-Receipt Violations • Updates to these data will have ripple effects in the system • If an update will lead to the orphaning of received DMR data, the system will not allow the update • For example, a monthly Limit Set cannot be changed to bimonthly if DMR data have been received for an off month • Delete the “orphaned” DMR data first before making the Limit Set change
Change in the Limit Sets Exercise Date Orphaned Yes/No Nov. 2013 Y / N Feb 2014 Y / N Mar 2014 Y / N Aug 2014 Y / N Sept 2014 Y / N
Change in the Limit Sets Exercise - Answers Date Orphaned Yes/No Nov. 2012 Y / N Feb 2013 Y / N Mar 2013 Y / N Aug 2014 Y / N Sept 2014 Y / N
Statistical Base Codes • As a data entry convenience, users may select default Statistical Base Codes (stat base codes) that will be applied to all Parameter Limits • Recommend that you only use this when you have a large number of parameters with the same stat base codes • Limit Statistical Base Codes do not have to match the Limit Set defaults • Edits to Limit Set Statistical Base Codes do not trickle down to already added Limits
Statistical Base Codes • Using the default Stat Base code may cause data invalid non-receipt violations if you don’t check your permit requirements carefully
Statistical Base Codes Maximum Minimum