140 likes | 281 Views
NCAB. NETS redundancy topics - 15-Dec-2004 Jeff Custard business continuity design redundancy overview (current and future). Redundancy. Starts in the closet – redundant: power supplies switch supervisor modules switch uplinks and on to Layer 3:
E N D
NCAB NETS redundancy topics - 15-Dec-2004 Jeff Custard business continuity design redundancy overview (current and future)
Redundancy Starts in the closet – redundant: power supplies switch supervisor modules switch uplinks and on to Layer 3: redundant routers (MSFCs in the switches)
Redundancy And extends out to BPOP and FRGP connectivity – redundant: physical connection paths commodity carriers
IPT redundancy At the server level -- redundant: power supplies hard drives server functionality
IPT Current redundancy for (call processing): CCM call routing SRST Future redundancy for: long distance authorization Cisco Emergency Responder
Layer3 restructuring project • http://www.scd.ucar.edu/nets/projects/layer3/index.html
VoIP at UCAR • http://www.scd.ucar.edu/nets/projects/voip/
BPOP • http://www.scd.ucar.edu/nets/projects/bpop/
FRGP • http://www.frgp.net/