1 / 9

Thomas Pham Material Control and Accounting Branch

Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010. Thomas Pham Material Control and Accounting Branch. Overview. Background Proposed changes Current status Next steps. Background.

rusty
Download Presentation

Thomas Pham Material Control and Accounting Branch

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Part 74 Material Control and Accounting (MC&A) Rulemaking UpdateNMMSS Users Annual Training MeetingLas Vegas, NV – May 20, 2010 Thomas Pham Material Control and Accounting Branch

  2. Overview • Background • Proposed changes • Current status • Next steps

  3. Background • After 9/11 events, staff were asked to conduct a comprehensive review of safeguards and security programs • Aug 5, 2005 – staff recommended revising MC&A regulations (SECY-05-0143) • Nov 18, 2005 – Commission directed staff to evaluate MC&A regulations and develop comprehensive rulemaking plan • Apr 25, 2008 – Staff submitted the rulemaking plan and technical basis (SECY-08-0059) • Feb 5, 2009 – Commission selected Option 4 of the proposed rulemaking plan

  4. Proposed Changes • Under Option 4 : • Part 74 will be revised to be applicable for current and future facilities • Most MC&A regulations in other chapters will be consolidated in Part 74 • MC&A regulatory guides and NUREG publications will be updated in conjunction with the Part 74 rulemaking

  5. Proposed Changes • Revise Subpart B – General Provisions - to include general performance objectives and basic system capabilities for all licensed facilities • Revise and add definitions (e.g., MC&A, item, MBA, physical inventory, waste) • Revise and eliminate exemptions (e.g., reprocessing facilities, 500-gram item control for Cat. III) • Addition of “two-person” rule

  6. Proposed Changes • Enhance tamper-indicating device (TID) program • Relocate Part 72 MC&A requirements • Will not relocate Part 40 and 150 requirements • Other changes

  7. Current Status • Staff submitted final technical basis in March 2010 • NRC staff working group has been formed • Working group will develop draft rule and submit by April 2011 • Staff are also revising MC&A regulatory guides

  8. Next Steps • After draft rule is presented to the Commission, expect approval in June 2011 • Draft rule will go out for public comment in July 2011 • Public comments will be addressed and the final rule will be submitted in early 2012 • Expect the final rule to be published around June 2012 • Work will continue on revising regulatory guides and NUREGs