An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Where Green Really Matters Diego Klabjan & Yue Geng Industrial Engineering and Management Sciences Northwestern University

  2. Extraterrestrial

  3. Back to Earth • Customers • NSF • Pat Haggerty and Renee Crain • Division of Arctic Sciences • Funding through NSF grant • General Motors • Jorge Arinez – R&D • Stephane Biller – R&D • Financial support

  4. Greenland: Summit • Major research site in the heart of Greenland • NSF approves and funds research projects • Logistics service provider • Logistics • Operations of the site • Challenge • Remote location, limited access • GM provides Chevy Volt

  5. Scope • Assess long term economical viability of Summit • Supporting transportation logistics needs • Operational considerations at Summit • Energy requirements • Environmental impact • Emissions from transportation • Renewable on-site generation

  6. Objectives • A tool to analyze scenarios • Cost • Emissions • Other KPIs • Given a possible scenario • Determine by means of optimization logistics requirements and expenses • Trade-off between cost and emissions

  7. Execution • Input • Demand through project requirements • Available transportation options • Cost parameters • Optimization models • Output • Overall logistics and operational cost • Carbon footprint

  8. Time (Days/Weeks) LC-130 from Scotia on day 8 arrive Kanger on day 9 Inventory left from previous day Vessel from VA Beach on day 2 arriving to Kanger on day 32 Time window for shipment A at origin Shipment A Location in the US 1 2 3 4 5 6 7 8 31 32 … … 1 2 3 4 5 6 7 8 31 32 … … Kanger 1 2 3 4 5 6 7 8 31 32 … … Summit … Time window for shipment A at destination Locations Aggregate by week Shipment A

  9. Model • Standard time based model • Main emission source • Fuel consumption at Summit • Heating, electricity, equipment, heavy machinery • Keeping track of fuel consumption at Summit • Challenge: Researchers and equipment consume electricity

  10. Bi-level Goal Programming • Phase 1 • Minimize cost • Phase 2 • Minimize emissions • Cost ≤ (1+f)∙ optimal cost from Phase 1 • Control tractability by aggregation • During season aggregate by week • Off-season by month

  11. Baseline • PRIMARY NODES • Kangerlussuaq • Summit Station • Thule Air Base • Remote Sites… Year 2008 calibration: CO2 Emission = 1,862 tons 47 vehicles Number of flights to Thule: very few Field Number of flights to Thule: 2 Basler Number of flights from Thule to Summit: 1 LC130 Number of vessels to Thule: 1 PacerGoose Number of flights from Kanger to Summit: 17 LC130 Number of vessels to Thule: 1 PacerGoose Number of flights from Kanger to Summit: 19LC130 Field Flights to remote locations: Kanger to Ilulissat 4 TwinO Kanger to Raven 3 TwinO Thule to Swiss Camp 1 T/O Number of vessels to Kanger: 2 Eimskip Number of vessels to Kanger: 2 Eimskip Number of flights to Kanger: 9 Basler and 5 C17 Number of flights to Kanger: 20 LC130 and 1 C5 Optimize Cost $900,000 CO2 Emission = 1, 701 tons 42 vehicles

  12. Fuel Implication at Summit

  13. Let’s Get Dirty with Renewables • Fuel consumption for electricity main source of emissions • Reduce also fuel delivery • Consider renewable sources • Wind turbines • PV panels • No sun in winter

  14. Renewable Portfolio • Given electricity demand • Find the right mix of renewable sources • Why not the lowest cost source?

  15. Model • Demand at hourly rate • How much of each renewable source to install? • Given • Output profile of each source • Installation cost (NPV) • O&M cost

  16. Here Comes GM • Manufacturing plants • Have been and will be using renewable resources • Only if positive NPV • Federal and state incentives • Investment and production tax credit • RECs • New option of power from grid

  17. Model Enhancement • Power purchase contract decisions • Power from spot market • At what year to switch from leasing to buying • Start accumulating RECs

  18. Enhancements • Constraints for each hour, month, and year • Incorporate risk • REC prices correlated to spot prices • Spot prices related to power purchase agreement • RECs and power purchase prices dependent

  19. Demand Profile

  20. GM Plant

  21. Should GM Invest?

  22. Holy Grail YIKES: Let’s stick with what-if!

  23. Almost as North as Summit