70 likes | 163 Views
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab
E N D
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation • In Slide Show, click on the right mouse button • Select “Meeting Minder” • Select the “Action Items” tab • Type in action items as they come up • Click OK to dismiss this box • This will automatically create an Action Item slide at the end of your presentation with your points entered. ATNICG/7 - IP/9 Agenda Item 3 07/03/12 ATS Message Handling System (AMHS)/System Wide Information Management (SWIM) Workshop and the Seventh Meeting of Aeronautical Telecommunication Network Implementation Co-ordination Group of APANPIRG (ATNICG/7) Chiang Mai, Thailand5 – 9 March 2012 Presenter: Md. Rafiqul Islam Deputy Director (Telecom) Civil Aviation Authority of Bangladesh
Reporting ATN Implementation Status • A project on ATN has been taken • This ATN project will be implemented at Hazrat Shahjalal International Airport, Dhaka, Bangladesh
Progress • A Tender Evaluation Process on ATN has been completed
Scope The requirements and technical specification defined by CAAB for establishment of the following components of ATN in Bangladesh: • ATN ground-ground router with wide area network connections with two ATN backbones: Bangkok and Mumbai • AMHS including AFTN/AMHS gateway • AFTN based AIDC to connect ATS centre of Dhaka to those of Kolkata and Yangon
Scope • The architecture, performance, reliability, quality of service and security requirements of the systems and the application programs shall comply with ICAO SARPs and specifications defined in ICAO Annex 10, Volume II, ICAO Document 9880 and 9896. • Router and AMHS shall be based on Internet Protocol Suite (IPS), referred to as ATN/IPS, as defined in ICAO Document 9896 and the AIDC shall be based on AFTN
Attention Areas • ATN will be implemented in CAA Bangladesh within 6 months.
Any Questions? Thank you