90 likes | 202 Views
Project MESA WI # 15 – Analysis of “System of Systems” Networking Technologies. Functional Requirements Analysis Template. Task Overview. Develop framework to conduct user requirement to functional requirement mapping Identify functional requirements clusters
E N D
Project MESAWI # 15 – Analysis of “System of Systems” Networking Technologies Functional Requirements Analysis Template
Task Overview • Develop framework to conduct user requirement to functional requirement mapping • Identify functional requirements clusters • Develop framework to conduct functional requirement to technology capabilities mapping • Describe a methodology to populate matrix to ensure consistency of responses and analysis
User to Functional Requirements Mapping User Requirements • High Level Network Architecture • Physical / Network Layer • Services Layer • Device Layer • Functional Requirements Cluster • Directly mapped to user requirements • Directly mapped to network architecture • Derived from user requirements or network architecture
Functional Requirement Development Example 1/30 Workshops 12/31 4DK’s Contribution
Functional Requirements Characterization Wireless Ecosystem Identification of elements in the ecosystem involved in enabling the functional requirement Example
Functional Requirements to Technology Mapping Description of technology solution proposed for each element of the ecosystems Justification at element level on how the proposed technology element or system enables the requirement Justification at element level on how the proposed technology element or system enables the requirement
Functional Requirements to Technology MappingExample GAP Example Justification at element level on how the proposed technology element or system enables the requirement Justification at element level on how the proposed technology element or system enables the requirement
Proposed Process • 12/31/07 -> Initial draft of User Requirements to Functional Clusters Mapping • Identification of user requirement gaps needed to be addressed by SSG • Initial feedback from TSG • 1/15/07 -> Revised draft of User Requirements to Functional Clusters Mapping and initial description of scope of Functional Requirement Cluster • 1/30/07 -> Face-to-face meeting: • Workshops to review and approve description of Functional Requirements Cluster description of scope • Develop high level functional requirements • Prioritization of Functional Requirements Clusters by SSG • Post 1/30/07 -> TSG Members aiming at making contributions conduct functional requirements to technology mapping • Continue with proposed workplan