New 400 kV interconnection line Bulgaria – Macedonia (Fyrom)

New 400 kV interconnection line Bulgaria – Macedonia (Fyrom). General parameters of 400 kV OHL SS Dubrovo – SS Chervena Mogila: Total length: 190.809 km Resistance, positive sequence, R1: 6.15 Ω Reactance, positive sequence, X1: 63.714 Ω Resistance, zero sequence, R0: 45.556 Ω

sage
Download Presentation

New 400 kV interconnection line Bulgaria – Macedonia (Fyrom)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New 400 kV interconnection line Bulgaria – Macedonia (Fyrom)

  2. General parameters of 400 kV OHL SS Dubrovo – SS Chervena Mogila: • Total length: 190.809 km • Resistance, positive sequence, R1: 6.15 Ω • Reactance, positive sequence, X1: 63.714 Ω • Resistance, zero sequence, R0: 45.556 Ω • Reactance, zero sequence, X0: 154.711 Ω

  3. For 2008/2009 the winter maximum load regime the calculated values of NTC between Bulgaria and Macedonia are: From Bulgaria to Macedonia 500 MW and From Macedonia to Bulgaria 230 MW

  4. Thank you for the attention!

More Related