1 / 18

2010 LiDAR Collection in West Virginia’s Coal Fields

2010 LiDAR Collection in West Virginia’s Coal Fields. West Virginia GIS Conference June 9, 2010. AOC and future mining  LiDAR. LiDAR collection specifications. Horizontal postings: 1 meter Vertical accuracy: 15 centimeters Additional derived data products include: ESRI elevation grid

sai
Download Presentation

2010 LiDAR Collection in West Virginia’s Coal Fields

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010 LiDAR Collection in West Virginia’s Coal Fields West Virginia GIS Conference June 9, 2010

  2. AOC and future mining  LiDAR

  3. LiDAR collection specifications • Horizontal postings: 1 meter • Vertical accuracy: 15 centimeters • Additional derived data products include: • ESRI elevation grid • Hillshade • 2 foot contours used in AML program • Intensity image  useful in QCing LiDAR data • ~ 2 TB of data before derived products

  4. LiDAR Technology LiDAR = Light Detection And Ranging • Capable of emitting 100,000 pulses per second at altitudes less than 1,100 meters • Day or night operation • Capable of collecting millions of elevation points per hour • All digital: no intermediate steps to generate digital XYZ • Rapid turnaround: Capable of processing within a week • Multiple returns per pulse • Airborne: Easy to mobilize and demobilize • Non-Intrusive: capable of accessing remote areas • Solid state Class IV laser • Swath width: Variable; 0 to 0.93 x altitude (m) • Horizontal Accuracy: 1/2000 x altitude • Elevation Accuracy: +/- 15 cm (or better) • Typical spot center spacing is from 0.5 m to 5.0 m

  5. Workflow • Acquisition NOAA Processing Product

  6. Flight Planning • Pulse rate frequency (PRF) • Scan frequency • Scan angle • Desired overlap • Altitude • Make sure above parameters yield an acceptable resolution

  7. Acquisition Process • Pre-Flight • Check aviation weather • Review day’s mission with pilots and ground crew • In Airplane • Check system • Power up • Communicate with ground control operator • Initialize GPS/IMU • In Flight • Transit to project area • Begin collection • Constantly monitor conditions during collection • Keep flight log • Post Flight • Final initialization on GPS/IMU • Power down • Retrieve removable hard drives for data decoding and processing

  8. Ground Control Two Topcon Hiper dual frequency static GPS receivers equipped w/ FC-100 controllers. 20 channel integrated GPS receiver Signals Tracked – L1/L2 C/A Code and P Code (dual frequency) 76 mb of Memory Advanced Multipath Reduction Logging Intervals of up to 20 times per second (20Hz) Horizontal – 3mm + 0.5ppm Vertical – 5mm + 0.5ppm Cold Start - < 60 sec Warm Start - < 10 sec Reacquisition - < 1 sec

  9. Ground Control Ground GPS Requirements • Base station must be within 30 km (18 miles) from airborne laser. • Use dual frequency GPS receivers. • Use two highly accurate published geodetic control points during airborne data collection to provide redundancy. • PDOP of 4 or less, optimal 3 or less. • Data collected from at least 6 satellites at 1 second epochs. • Base stations must have a clear view of the sky with limited mulitpath.

  10. GPS Planning

  11. SBET

  12. Processing Workflow ALTM Storage Download Hard Drive QC Data Extract / Decode Laser Data File Process GPS IMU Information Raw Laser Data PosPac Compute Laser Points Output Laser Points Microstation

  13. Calibration

  14. Building an ICI (=isolated computing island) • Isolates one or more VERY high performance computers from central IT C&C duringVERY long compute jobs: • No pushes of server OS upgrades • … followed by the requisite reboots • Isolate from dependence for TIPS licenses via pool of WVDEP licenses  network outages • Enough local storage to create a peer-to-peer within-the-room network • UPS on each PC

  15. PC specs HP800 workstations with 64 bit OSes  super modular. Single quad core CPUs  5th fastest on the planet when we purchased the boxes 16 GB RAM & 6 TB each local storage 4 megapixel displays + CUDA card Isolated peer-2-peer network when working off the net Gigabit network connections for on Net Local licenses of all core apps

  16. Qcing LiDAR and LiDAR software • QCing LiDAR deliverables • 2003 Statewide GCPs file • Multiple LiDAR datasets that overlap  difference grid calculation • Trimble R8 GNSS receivers for spot checks • Outsource via FEMA monies • Software  64 bit, use multicores • Virtual Geomatics • Applied Imagery’s Quick Terrain Modeler

  17. WV CORS

  18. The end