70 likes | 158 Views
Math project. Task 1. Cont. Task:1. Q 1 ] Sprint: 25.75+ 0.30X Verizon:55.50+ 0.10X Cingular: 0.75X Q 2 ] 1)60→140 minutes . 2)150→200 minutes 3)0→50 minutes 4) sprint 5) Verizon 6) 150minutes 7)Verizon, Because it is the cheapest company. Cont. task 1. Q 3]
E N D
Cont. Task:1 Q 1] Sprint: 25.75+0.30X • Verizon:55.50+0.10X • Cingular: 0.75X Q 2] • 1)60→140 minutes. • 2)150→200 minutes • 3)0→50 minutes • 4)sprint • 5)Verizon • 6)150minutes • 7)Verizon, Because it is the cheapest company.
Cont. task 1 • Q 3] • 25.75+0.30X= 55.50+0.10X • 0.30X-0.10= 55.50-25.75 • 0.2X =29.75 • 0.2 0.2 • X=148.75
Task: 2 Q1] • a. 48/3= 16 tricycles • b. tx3=w Q2] • a. 1) 5x3=15 Wheels for tricycles 15/3 = 5 tricycles 2) 50-15=39 Wheels for bicycles 35/2 = 17.5 bicycles • b. B < t 17.5<5 2x>/ 5
Cont. task :2 • C)
Task:3 • Visit our website: http://Athsmathproject.yolasite.com/