1 / 15

CE S

CE S. Disaster Management Support Group. Collaboration with WGISS. Work with WGISS task teams, e.g. IDN, WWW, Data Services Work with WGISS strategy WGISS Meeting & CSIRO Workshop in May Provide info to WGISS/Task Teams before April. Collaboration with WGISS.

said
Download Presentation

CE S

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CE S Disaster Management Support Group Collaboration with WGISS • Work with WGISS task teams, e.g. IDN, WWW, Data Services • Work with WGISS strategy • WGISS Meeting & CSIRO Workshop in May • Provide info to WGISS/Task Teams before April

  2. Collaboration with WGISS • Approach--DMSG define requirements & pass on to WGISS • WGISS can better understand scope of our problem • Different from current WGISS scenarios (“use cases”)? • Some differences (my preliminary perception) • Many DMSG “use cases” high level, poorly defined • Often users doesn’t know what they need • Requirements are diverse • Requirements are often specialized • Users speak a different language DMSG requirements very different, I believe!! Opportunity & challenge for WGISS & DMSG

  3. Hazard Team Recommendations Some Recurring Themes Integrated satellite/in-situ data sets - Models - GIS/SDI Improved communications--networks Compelling demonstrations--fire,flood,…. Global data bases--accreditation/standardization - E.g. DEM (~1m vertical resolution) Global systems

  4. fuel maps dead fuel moisture detection monitoring biomass burning fire extent

  5. T E A M R E Q U I R E M E N T S Flood

  6. Geostationary and Polar Weather Satellite Spatial and Temporal Requirements For Flash Floods Threshold Optimum Channels Spatial Temporal Spatial Temporal VIS 1 km 1 hr 1 km 5 min 3.9 micron 4 km 1 hr 1 km 5 min 6.7 micron 8 km 1 hr 1 km 5 min 10.7 micron 4 km 1 hr 1 km 5 min 12.0 micron 4 km 1 hr 1 km 5 min 85.5 GHz 15 x 13 km 12 hr 10 x 10 km 15 min 37.0 GHz 37 x 28 km 12 hr 10 x 10 km 15 min 22.2 GHz 50 x 40 km 12 hr 10 x 10 km 15 min 19.3 GHz 69 x 43 km 12 hr 10 x 10 km 15 min

  7. Spatial Resolution Requirements By Application Application Phase Threshold Optimum Sensor Type Land Use Pre-flood 30 m 4-5 m MSI Post-flood Infrastructure Pre-flood 5 m <= 1 m PanVisStatus Post-flood Vegetation Pre-flood <= 250 m <= 30 m MSI/HIS Post-flood Soil Moisture Pre-flood 1 km 100 m SAR/PM Snow pack Pre-flood 1 km 100 m SAR/PM DEM (vertical) Pre-flood 1-3 m .10-.15 m InSAR/ Post-flood PanVis Flood development During flood <= 30 m <= 5 m SAR/MSI/and flood peak Post flood PanVis Damage Post-flood 2-5 m .3 m MSI/PanVis/Assessment SAR Bathymetry Pre-flood < 1 km 90 m SAR/MSI/HIS(near shore) MSI = Multi-Spectral Imagery PanVis = Panchromatic Visible InSAR = Interferometric SAR HIS = Hyper-Spectral Imagery SAR = Synthetic Aperture Radar PM = Passive Microwave

  8. months Infrastructure status 1-3 yrs / 6 months months Land use 1-3 yrs / 6 months months Vegetation 3 months / 1 month 1 day Soil Moisture 1 week/daily 1 day Snow Pack 2 month/1 week DEM pre- & post-flood 1-3 yrs / months months hours-days (function of Flood development hours-days (function drain age basin) / 24 hr Flood peak of drainage basin) 2-3 days / < 1 day Damage assessment n/a months Bathymetry pre- and 1-3 yrs / months post-flood Temporal Resolution Requirements By Application Image refresh rate Image delivery time (Threshold/Optimum) Application (Threshold/Optimum)

  9. T E A M R E Q U I R E M E N T S Oil Spill

  10. Enforcement / 100m 100km weekly N/A 3 hours monitoring 50m 300km daily < 1 hour Major coastal spill 20m 30km daily 2 days 2 hours (accident) 5m >100km hourly < 1 day < 1 hour Minor coastal spill 100m 100km daily N/A 3 hours (dumping) 50m 300km hourly < 1 hour Spill distribution 100m 100km weekly N/A N/A survey 50m 300km daily Observational Requirements For C-Band SAR Threshold  Optimum  Spatial Delivery Use Case Spatial Temporal Tasking resolution time time coverage resolution Spatial coverage = swath width Note: To match costs of airborne SLAR, costs must be < 2.5 ¢ / km2

  11. T E A M R E Q U I R E M E N T S Volcanic Hazards

  12. Data Resolution Requirements Spatial Temporal Phenomenon Data Threshold Optimum Threshold Optimum Ash cloud IR 5 km 1 km 30 min 15 min Visible 1 km .5 km 30 min 15 min Sounder 10 km 2 km 30 min 15 min SO2 Cloud UV 20 km 10 km 2 hr 15 min Thermal Anomaly * IR 1 km 30 m - Persistent 2 hr 15 min - Transient 30 sec 10 sec * Thermal anomaly verified with false alarm ratio <5%

  13. THEEND

More Related