NWMT.SYSTEM

NWMT PATH SEGMENTS. Posted 1-28-2011. GLWND2. SCUTBANK. AVAT.NWMT. GLWND1. GREATFALLS. BPAT.NWMT. GTFALLSNWMT. NW-MT. CANYONFERRY. NWMT.SYSTEM. NWMT.SYSTEM. GARRISON. 600 MW. CROSSOVER. COLSTRIP. MLCK. HARDIN. MTSE. YTP. TNDY. PTSN. JEFF. ANTE. BRADY.

sailor
Download Presentation

NWMT.SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NWMT PATH SEGMENTS Posted 1-28-2011 GLWND2 SCUTBANK AVAT.NWMT GLWND1 GREATFALLS BPAT.NWMT GTFALLSNWMT NW-MT CANYONFERRY NWMT.SYSTEM NWMT.SYSTEM GARRISON 600 MW CROSSOVER COLSTRIP MLCK HARDIN MTSE YTP TNDY PTSN JEFF ANTE BRADY

  2. NORTHWESTERN ENERGY – MONTANA (NWMT) Posted 1-28-2011 Maximum Long Term ATC Export Capability With internal constraints 100 TTC GLWND2 SCUTBANK 130 TTC AVAT.NWMT GLWND1 GREATFALLS • TTC 100 TTC 100 TTC West of Broadview GTFALLSNWMT 200 TTC BPAT.NWMT NW-MT 508 TTC 890 TTC West of Crossover 58 TTC CANYONFERRY NWMT.SYSTEM West of Colstrip 250 TTC GARRISON NWMT.SYSTEM 400 TTC 180 TTC 600 TTC COLSTRIP MLCK 450 TTC HARDIN MTSE CROSSOVER • TTC 30 TTC 30 TTC 87 TTC YTP TNDY PTSN Total Transfer Capacity (TTC) export values at external interfaces are yearly values as of January 27, 2011. NOTE: This drawing is for informational purposes only – the actual TTC values are subject to change based upon WECC OTC studies and seasonal changes. Actual real time ATC is available on OASIS JEFF ANTE 250 TTC BRADY

  3. NORTHWESTERN ENERGY – MONTANA (NWMT) Posted 1-28-2011 Maximum Long Term ATC Import Capability With internal constraints 100 TTC GLWND2 SCUTBANK 140 TTC AVAT.NWMT GLWND1 GREATFALLS 140 TTC 100 TTC 382 TTC West of Broadview GTFALLSNWMT BPAT.NWMT NW-MT 498 TTC 863 TTC 890 TTC West of Crossover 58 TTC CANYONFERRY NWMT.SYSTEM West of Colstrip 180 TTC GARRISON NWMT.SYSTEM 1161 TTC 250 TTC COLSTRIP 600 TTC MLCK CROSSOVER HARDIN 478 TTC MTSE 400 TTC 72 TTC YTP TNDY PTSN Total Transfer Capacity (TTC) import values at external interfaces are yearly values as of January 27, 2011. NOTE: This drawing is for informational purposes only – the actual TTC values are subject to change based upon WECC OTC studies and seasonal changes. Actual real time ATC is available on OASIS JEFF ANTE 180 TTC BRADY