40 likes | 168 Views
GG test. Zbigniew Baranowski. I. Preparation. Preparation of the hardware at T1s (in progress) Installation of 11.2.0.4 ( RAC or single instance) Create GGADMIN schema (a script to be executed) Create GGUSER test schema (with standard application grants + ~100GB tablespace).
E N D
GG test Zbigniew Baranowski
I. Preparation • Preparation of the hardware at T1s (in progress) • Installation of 11.2.0.4 (RAC or single instance) • Create GGADMIN schema (a script to be executed) • Create GGUSER test schema (with standard application grants + ~100GB tablespace)
II. Generic workload tests (March) • Remote configuration • All config to be done at T0 (SW& HW is ready) • Run worklload and measure throughputs (at T0 and T1s) • Local configuration • Installation of GG binaries on db system • ~100GB is needed for TRAIL FILES • Setting up processes at T0 and T1s • Run worklload and measure throughputs (at T0 and T1s)
III. Tests with production workload (April – May) • Remote all local config (depending which worked better in previous test) • Set up of GG process (start of extract) • Dupliaction of T1s COOL replica to 11.2.0.4 db (expdp/impdp) • Start the rest of the GG processes • Run it for couple of weeks • Measure performance • Check data consistancy (Veridata)