1 / 7

KUR

Connectivity diagram of KUR Division for FOIS Phase- II. To. GRC. 4. V. 8. BHC. 13. 7. V. TLHR. V. 11. V. 6. V. 5. To. GRC, WAT. CSP. V. V. 2. 1. PRDP. V. 12. KUR. 10. V. 3. PSA. To. 9. SCMN. Legend. BSNL channel commissioned. Existing location

saima
Download Presentation

KUR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Connectivity diagram of KUR Division for FOIS Phase- II. To GRC 4 V 8 BHC 13 7 V TLHR V 11 V 6 V 5 To GRC, WAT CSP V V 2 1 PRDP V 12 KUR 10 V 3 PSA To 9 SCMN Legend BSNL channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V VSAT proposed Dy.CNM/FOIS/GRC Dy.COM/FOIS/GRC

  2. Connectivity diagram of CKP division for FOIS (Phase- II) To 9 17 18 JSG 7 V SBP DPS BSPX BRJN 21 5 12 To GRC 15 11 ADA CNI 10 4 16 3 CKP BNDM 19 V V V V 6 2 8 1 (Purnupani shown in ADA & RNC diagram) 14 KRBU TATA ADTP 13 Legend BSNL channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V VSAT proposed Dy.CNM/FOIS/GRC Dy.COM/FOIS/GRC

  3. Connectivity diagram of BSP & Raipur division for FOIS (Phase- II ) V BJRI SDL CRIS SBP JSG SBP NGP BSP KRBA RIG BRJN 43 23 33 26 28 22 17 46 35 27 R 44 29 30 SBP BIA Yd. DGG MNDH,KBJ,TIG,MSMD,KRAR V Loc. Sr. No. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,18,19,20,21 BIA 24,25,31,32,34,36,37,38,39,40,41,42,45,47 Legend BSNL channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V VSAT proposed Dy.CNM/FOIS/GRC Dy.COM/FOIS/GRC

  4. Connectivity diagram of NGP division for FOIS (Phase- II) 8 4 2 14 V V V V V V V V 11 1 3 9 5 12 10 BIA Yd. NGP G DGG To 7 ITR SBP BSP 15 V V 13 6 Legend BSNL channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V VSAT proposed DY.CNM/FOIS/GRC Dy.COM/FOIS/GRC

  5. Connectivity diagram o f WAT division for FOIS (Phase- II) V 16 V 8 10 11 V V 15 V 9 V 17 18 V 6 WAT V 12 14 SBP, KUR PSA SCMN V 1 2 V 13 VSPS V V 7 V V V 5 3 4 Legend BSNL channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V VSAT proposed Dy.CNM/FOIS/GRC Dy.COM/FOIS/GRC

  6. Connectivity diagram of KGP division for FOIS( Phase- II ) V 14 10 7 12 9 KGP GRC 6 To CRIS, SBP, CKP, BHC, KUR, ADL 13 SHM HLZ 8 2 1 V 11 3 5 V 4 Legend BSNL Channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V VSAT proposed Dy.CNM/FOIS/GRC Dy.COM/FOIS/GRC

  7. Connectivity diagram of ADA & RNC division for FOIS (Phase- II) 7 5 V V V 8 V V V 4 10 V 11 17 V V 23 V 3 BKSC 12 V V V 13 9 1 6 To HTE ADA KGP, CKP CNI V MURI 20 22 SBP 15 18 19 16 21 V Purunapani Legend BSNL channel commissioned Existing location Proposed location Rly channel commissioned Rly channel proposed LAN Extender proposed V Dy.CNM/FOIS/GRC Dy.COM/FOIS/GRC VSAT proposed

More Related