250 likes | 266 Views
Asphalt Base Repair: Fix The Problem. James Anderson DPW/ACEC Training Event February 27, 2018. Basic Premise: We don’t build bridges out of Hot Mix Asphalt. Why?.
E N D
Asphalt Base Repair: Fix The Problem James Anderson DPW/ACEC Training Event February 27, 2018
Basic Premise:We don’t build bridges out of Hot Mix Asphalt.Why?
Asphalt is a flexible pavement.Putting a new layer of asphalt on something that is yielding, flexing, or moving WILL result in premature failure of that new pavement.
It’s important to note the pavement distresses that exist PRIOR to milling the surface…Not just after milling.
Milling may remove the EVIDENCE of the distress….But not necessarily the CAUSE.
Those cover the most common, visible indicators of pavement distress where some type of Base Repair is likely to be needed…BUT….
“Well Compacted” means…. That the Hot Mix Asphalt is…well…HOT Material placed in “Lifts”, if necessary (2-4 x Agg size) Able to actually get equipment into the patch to compact ALL of the area…ESPECIALLY the joint of new and old pavement That we aren’t trying to build a “Bridge” of HMA Base over something that is yielding beneath it
Additional Resources • FHWA Publication: • RD-03-031, “Distress Identification Manual” • LTAP Publication: • LTAP-05-001 “Distress Identification Guide”