1 / 5

Manufacture of Construction Equipment & Machinery

Manufacture of Construction Equipment & Machinery Introduction Need Assessment Proposed Project Financial Evaluation Construction Equipment & Machinery Introduction Long history of indecision and failure Initiated in early 1960s Transferred to PIDC in mid 1960s

salena
Download Presentation

Manufacture of Construction Equipment & Machinery

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manufacture of Construction Equipment & Machinery Introduction Need Assessment Proposed Project Financial Evaluation Series 1 | Version 1

  2. Construction Equipment & MachineryIntroduction • Long history of indecision and failure • Initiated in early 1960s • Transferred to PIDC in mid 1960s • Transferred to HMC in mid 1980s • No action to-date • All construction machinery is still imported Series 1 | Version 1Investment Opportunities in Pakistan

  3. Construction Equipment & MachineryNeed Assessment • Construction machinery is vital for accelerating development • The present population of crawler bulldozers in Pakistan is estimated at around 3000 • Pakistan is importing about 100 machines per year on the average at a total foreign exchange expenditure of approximately Rs. 300 million • Import figures do not reflect actual demand which is in fact suppressed • Since large amount of public money has already been either ear-marked or disbursed for contruction activity, the need for construction equipment and machinery is bound to only increase Series 1 | Version 1Investment Opportunities in Pakistan

  4. Construction Equipment & MachineryProposed Project • The objective of the Project is to produce Construction equipment and machinery locally • The project is proposed to be located at Taxila, Lahore or Karachi • Initially an assembly plant may be set up and components purchased from local vendors such as HMC, DESCON, Karachi Shipyard etc • Initially the unit may produce only 75HP and 150HP bulldozers, loaders, excavators, etc. may be added. Series 1 | Version 1Investment Opportunities in Pakistan

  5. Construction Equipment & MachineryFinancial Evaluation • Investment - Rs. 500 million including the cost of transfer of technology, licensing fees etc. of the OEM • IRR - 18% Series 1 | Version 1Investment Opportunities in Pakistan

More Related