An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monitoring and Controlling the Project Key Concepts Plan-Monitor-Control Cycle Data Collection and Reporting Earned Value

  2. Plan-Monitor-Control Cycle • Closed loop process • Planning-monitoring-controlling effort often minimized to spend time on “the real work”

  3. Designing the Monitoring System • Identify special characteristics of performance, cost, and time that need to be controlled • Real-time data should be collected and compared against plans • Avoid tendency to focus on easily collected data

  4. Formats of Data • Frequency Counts • Raw Numbers • Subjective Numeric Ratings • Indicators and Surrogates • Verbal Characterisations

  5. Data Analysis • Aggregation Techniques • Fitting Statistical Distributions • Curve Fitting • Quality Management Techniques

  6. Report Types • Routine • Exception • Special Analysis

  7. Reporting • Not all stakeholders need to receive same information • Avoid periodic reports • Impact of Electronic Media • Relationship between project’s information system and overall organisation’s information system

  8. Meeting Guidelines • Should be help primarily for group decision making • Distribute written agenda in advance of meeting • Ensure everyone is properly prepared for meeting • Chair of meeting should take minutes • Avoid excessive formality • If held to address specific crisis, restrict meeting to this issue alone

  9. Earned Value • Percent of task’s budget actually spent not good indicator of percent completion

  10. Earned Value ACWP = Actual Cost Work Performed BCWP = Budgeted Cost Work Performed BCWS = Budgeted Cost Work Scheduled SV = Schedule Variance CV = Cost Variance AC = Actual Cost TE = Planned Time TA = Actual Time CPI = Cost Performance Index SPI = Scheduled Performance Index TPI = Time Performance Index CSI = Cost-Schedule Index ETC = Estimated Cost to Complete BAC = Budget at Completion EAC = Estimated Cost to Complete FAC = Computed Cost to Complete VAC = Variance at Completion LOE = Level of Effort

  11. Earned Value CV = BCWP - ACWP SV = BCWP – BCWS CPI = BCWP/ACWP SPI = BCWP/BCWS

  12. Earned Value

  13. Earned Value

  14. PROJECT CONTROL Background • Acts which seek to reduce differences between plan and actuality • Difficult Task • human behavior involved • problems rarely clear cut

  15. Purpose of Control • Stewardship of Organisational Assets • physical asset control • human resources • financial control • Regulation of Results Through the Alteration of Activities

  16. DESIGNING THE CONTROL SYSTEM • Purpose is to correct errors, not punish the guilty • Investments in control subject to diminishing returns • Must consider impact on creativity and innovation • Be careful not emphasise short-run results at the expense of long-run objectives • Dangers of across the board cuts

  17. Primary Mechanisms by Which PM Exerts Control • Process Reviews • Personnel Assignments • Resource Allocations

  18. Components of a Control System • Sensor • Standard • Comparator • Decision Maker • Effector

  19. Types of Control Systems • Go/No-Go Controls • predetermined standard must be met for permission to be granted to continue • Post-Control • done after project completed • purpose is to allow future projects to learn from past project experience

  20. SCOPE CREEP AND CHANGE CONTROL • Coping with changes frequently cited by PMs as the single most important problem • Common Reasons for Change Requests • Client • Availability of new technologies and materials

  21. Purpose of Change Control System • Review all requested changes • Identify impact of change • Evaluate advantages and disadvantages of requested change • Install process so that individual with authority may accept or reject changes • Communicate change to concerned parties • Ensure changes implemented properly • Prepare reports that summarize changes made to date and their impact

  22. Rules for Controlling Scope Creep • Include in contract change control system • Require all changes be introduced by a change order • Require approval in writing by the client’s agent and senior management • Consult with PM prior to preparation of change order • Amend master plan to reflect changes