1 / 22

ITC-ILO/ACTRAV Training Workshop for ACFTU A3-01396 Negotiating Productivity linked agreements in Entreprises

ITC-ILO/ACTRAV Training Workshop for ACFTU A3-01396 Negotiating Productivity linked agreements in Entreprises. What is Productivity?. Productivity v/s Work Intensity

salene
Download Presentation

ITC-ILO/ACTRAV Training Workshop for ACFTU A3-01396 Negotiating Productivity linked agreements in Entreprises

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITC-ILO/ACTRAV Training Workshop for ACFTU A3-01396Negotiating Productivity linked agreements in Entreprises

  2. What is Productivity? • Productivity v/s Work Intensity • Productivity does not only mean increasing working time; it can also mean finding ways to produce more output within the same time or same output within lesser time thru - - Technological improvement - Methods & Systems improvement - Line balancing

  3. Factors influencing Enterprise Productivity External: • Availability of raw material • Availability of skilled manpower • Government policies towards taxation, credit, interest rates, economic policies, labour laws • Overall economic health of the country and the industrial sector Organization may have very less controls over these

  4. Factors influencing Enterprise Productivity Internal: • Land, building, factory lay out and location • Raw material quality, choosing a good vendor/ supplier of material • Energy: type of energy used, costs of energy (wind, solar, gas, electricity, coal, diesel, etc) • Machine and equipment • Human resources: trained to perform operational activities/managerial capabilities/administration etc • work norms & organization within the factory Organization has much control over these

  5. General problems within the Company • Out dated and rigid work norms • Restrictive and narrow job descriptions • Too many non value adding activities • Idle manpower on one hand & high incidents of overtime on other hand • Maladjusted production schedule • Shortages of critical items on one hand & growing inventory on the other hand • Unbalanced work load and bottlenecks • Break-downs • Rejection and reworks • Absenteeism and labor turn over • Lack of accountability • Discontent, low morale and responsibilities. • Mismatch between authority and responsibilities

  6. Remedial Approaches A. Organizational: • Promoting transparency and participation • Role enrichment and flexible job description • Integrating functions like quality control and maintenance with production function • Flat and lean organization • Information and communication systems • Job rotation and group working

  7. Remedial Approaches B. Normative: • Instead of fixed targets, agreeing to overall work load levels and rest periods • Day to day target modifications as per incidence of forced idle time and outside the cycle work • Continuous rebalancing of work load for fair distribution and removal of bottlenecks • Making traditionally non measurable work measurable

  8. Remedial Approaches C. Technical: • Effort reducing techniques • Minimum transport layout • Multiple operative facilities • Ergonomic improvement • Health and safety measures D. Economic: • Evaluation of individual contribution • Sharing gains and loses with various stakeholder, especially employees • “Make or buy” decision

  9. Remedial devices used for these approaches: • Work measurement devices like: time and motion study, MOST etc • KAIZAN, Lean manufacturing, 5 S, TQM, etc. • Collective Agreement as a vehicle of participation • Productivity linked remuneration schemes • Company performance linked schemes • Crisis situation plans • Monitoring the economics of a firm

  10. Considerations before signing productivity agreement • Work intensity differs from worker to worker, from dept to dept, some workers put in 5-6 hours of effective working time, some work for 7 or 8 hours - When management asks for 20% higher production – - workers working for less hours have no problem but those who already put in 8 hours at work, their workload increases intolerably - management demand for 20% increase is based on the highest working time – which means that workers as a whole end up giving much more while being paid for only 20% need for work study & line balancing to bring down overloaded workers while bringing up under loaded workers.

  11. What should Union do? Before productivity linked wage agreement can be signed, Union should demand: • Work Study– systematic examination of the methods & time taken for carrying out activities at work place so as to improve use of resources (human, machine, material) & set up performance standards – joint participation of union & management required in this process Note: It is not only labour but also machine & methods productivity that needs to be looked into.

  12. Work study should aim at - • Simplifying or modifying the methods of operation • Reduce unnecessary or excess work, reduce ineffective time spent by workers in doing things due to poor design, layout of the workplace or in material handling, etc • Stop wasteful use of resources • Contribute to industrial safety by identifying hazardous work and developing safer methods • Cut down the time for performing certain activities after introducing systems & methods improvement & line balancing. work study includes not only labour but also period required to recover from fatigue.

  13. Commonly used methods of work measurement • Time & Motion studies - to reduce the number of motions in performing a task in order to increase productivity • (MOST) Maynard Operation Sequence Technique - pre determined motion time standard – used to set the standard time in which a worker should perform a task. Work = Force + Distance Task is broken down into individual motion elements, & each is assigned a numerical time value in time measurement units (100,000 TMUs = 1 hour). All the motion element times are then added together and any allowances are added, and the result is the standard time

  14. Working Time in a day General Norm: • Out of 480 minutes (8 hours), at best 420 minutes of working time should be there – 60 minutes are set aside for rest, lunch break (half hour) and 2 breaks of 15 minutes each for tea-coffee, etc • Out of 420 minutes available for work, following deductions from working time need to be considered: - personal needs allowance - fatigue allowance – differs for different job stations - hazard allowance – for certain hazardous jobs • down time (disturbance in production cycle due to material not available, machine break down, etc – record should be kept of this by the workers)

  15. Negotiating Productivity- pre-requisites • Work study & line balancing – joint union-mgt exercise & decision making – not just consultation • Deciding on allocable time in a shift, taking into account rest period, lunch, time off for personal needs, fatigue, hazardous jobs, down time and material handling time • Commitment of the top mgt to invest in changes needed for improving productivity • Sharing in the gains from productivity – share in value added, company performance allowance (over & above the CB agreement)

  16. Financial information required for preparing charter of demands • 1. Sales/turn over, • 2. Capital employed/capital size, • 3. Employment size, • 4. Value Added = Income – Non Factor Expenditure. (non-factor expenditure means expenditure other than employee cost, depreciation and interest). • 5. Material intensity/input intensity = sales -------------- value added • 6. Capital intensity/capital output ratio = Capital --------------- value added • 7. Value added per manday • 8. Return to capital per manday

  17. 9. Rate of profit = Share of Capital ------------------------ Capital employed • 10. Employee cost (Bargainable/unionized) per man day • 11. Prize mark up i.e., value added per unit, • 12. Trend of output prices and input prices. • 13. Capacity utilization of the plant and machinery, • 14. Market share of the firm, • 15. Ratio of financial result/ratio of operational results, • 16. Ratio of debt/ratio of equity, • 17. Percentage of non-operational income, • 18. Break even point of sales and output, • 19. Balance Sheet & Profit & Loss Account of Last 3 Years of the Company. • 20. Productivity Data for each workstation including all elements.

  18. Issues covered under CBA • WAGE STRUCTURE • Consolidated Monthly Wage Grades • Fitment • Annual Increments • Service Increments • Classification • Dearness Allowance • Productivity Bonus Scheme • WORKING HOURS & LEAVE • Hours of Work • Holidays • Closed Days and Holidays • Leave

  19. Issues covered under CBA • ALLOWANCES • Education Allowance • Conveyance Allowance • House Rent Allowance • Personal Pay • Leave Travel Assistance • Medical Benefit Advance • Shift Allowance • Overtime • Officiating Allowance • Work on Weekly Off Day • Lunch / Dinner Allowance • Local Travel • Outstation Transfer Allowance • Outstation and traveling Allowance

  20. Issues covered under CBA • PROTOCOLS / PROCEDURES • Working Protocol • Promotion Procedure for Workmen • System of Wage Grade Promotion • NEEDS OF THE ORGANISATION • Working System • Productivity Committees • Conversion • Work Measurement • Multi – Machine

  21. Issues covered under CBA • MISCELLANEOUS • Protective Equipment • Retirement Age • Provident Fund • Gratuity • Canteen Facilities & Subsidized Food • Saving Scheme • Recruitment Policy • Workmen Welfare Schemes • Temporary Workmen • Transfer of Wages Through Bank • Recognition • Existing Rights and Privileges • Application of the Settlement • Payment of Arrears • Duration of the settlement • Implementation Committee

  22. GFC, Companies & Response In one Company Management, taking advantage of Global Financial Crisis, asked Union to accept wage cut of 20% or reduce workforce by 20%. Union analysed company balance sheet and found the following: • Material Cost ......... 78% Energy Cost .........  10% • Admn. Cost ..........   4% Labour Cost........     8%  • Reduction by 20% head count or wages meant only 1.6% savings (20% of 8%) BUT targeting saving in material & energy costs by 10% would give 8.8% cost.  Management had no answer but to accept union’s proposal and in this way Union saved the jobs as well as wages.

More Related