1 / 4

A multi-purpose river valley project across a major river is planned for construction. Irrigation, power development

Assignment Solutions, Case study Answer sheets <br>Project Report and Thesis contact<br>aravind.banakar@gmail.com<br>www.mbacasestudyanswers.com<br>ARAVIND – 09901366442 – 09902787224<br>

Download Presentation

A multi-purpose river valley project across a major river is planned for construction. Irrigation, power development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Management

  2. Construction Management Q1.What a note on tender and tender notices Q2.Discuss the different types of tenders? Q3.Write a note on EMD and SD. Q4.What are the procedures followed after the opening of a tender? Q5.Explain the importance of organization in construction activities

  3. Q6.Enumerate the general principles to be followed in forming an organization system. Q7.A multi-purpose river valley project across a major river is planned for construction. Irrigation, power development, fisheries and picnic development are all planned. Suggest a suitable organization structure for construction and maintenance of this project.

  4. Global Study Solutions Dr. Aravind Banakar aravind.banakar@gmail.com www.mbacasestudyanswers.com 9901366442 – 9902787224

More Related