1 / 6

Explain in detail COCOMO Cost Estimation Model.

Assignment Solutions, Case study Answer sheets <br>Project Report and Thesis contact<br>aravind.banakar@gmail.com<br>www.mbacasestudyanswers.com<br>ARAVIND – 09901366442 – 09902787224<br>

Download Presentation

Explain in detail COCOMO Cost Estimation Model.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Software Management

  2. Software Management Q1.Explain in detail the phases involved in the Waterfall model. Q2.A software package is to be designed and build to assist in software cost estimation. It will input certain parameters and produce initial cost estimates to be used at bidding time. a)It has been suggested that a software prototype would be of value in these circumstances. Explain why this might be.

  3. b)Discuss how much prototyping could be controlled to ensure that it is conducted in an orderly and affective way and within a specified time span Q3.Differentiate between principles of Conventional Software Engineering and Modern Software Management. Q4.The application of risk management to software development projects has been strongly advocated. In practice, however, managers are often reluctant to apply the techniques. What do you think might be the reason for this

  4. Q5.Differentiate between principles of Conventional Software Engineering and Modern Software Management. Q6.The application of risk management to software development projects has been strongly advocated. In practice, however, managers are often reluctant to apply the techniques. What do you think might be the reason for this

  5. Q7.If you were asked as an expert to provide an estimate of the effort needed to make certain changes to an existing piece of software, what information would you like to hand to assist you in making that estimate? Q8.Explain CMM, its levels in brief along with examples? Q9.Explain in detail Iteration Workflows?

  6. Global Study Solutions Dr. Aravind Banakar aravind.banakar@gmail.com www.mbacasestudyanswers.com 9901366442 – 9902787224

More Related