An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONSOLIDATION CPS-BL SYSTEM V. Prieto Hermosilla AB/BI/BL

  2. OUTLINE • The CPS BL Monitoring system • Functionalities • Calibration (PS vs. SPS) • Main Problems • New Options: LHC-IC Test on PS • Budget & Planning CPS_BL SYSTEM

  3. PS LAYOUT PS:100(4 SECTORS) TT2:8 nTOF:1 TOTAL BL: 164 AD:2 Injection: 6 Booster:32 (2 SECTORS) Transfer:10 ISOLDE:10 CPS_BL SYSTEM

  4. PS BEAM LOSS • ACEM (Al Cathode Electron Multiplier Tube) • Isat=100mA (Average anode current)(6.107particles in the ACEM/10ms) • Integration mode (fixed Gain)+ADC • Integration mode +Analog acquisition. (OASIS) • -800V<Vp<-1100V • Video (display 8 bits) + Survey (read out 12 bits using 8MSB, every 100ms) CPS_BL SYSTEM

  5. CPS_BL SYSTEM

  6. CURRENT HV Pb IN/OUT CALIBRATION • Every BL is tested in Lab. with a radioactive source (Cs137).We read the Idark(N) and the Isource(S) for several HV values. The signal adjustment is made for the nominal HV. If the ratio S/N is too large, the BL has to be changed. • All the calibration is done in a dedicated test bench, designed in collaboration with SG-RP and BI-ML. • Manpower: 2 persons/6-8 weeks CALIBRATION DATA CPS_BL SYSTEM

  7. CALIBRATION (II) Horizontal: sector number Vertical: normalized units CPS_BL SYSTEM

  8. CALIBRATION CPS (III) • About 5% of monitors has to be changed every year (ratio S/N under the limit). • 5-10% has to be relocated. • Loss of gain in the oldest monitors. • Electronics: OK. • Malfunctioning is mainly due to monitors aging CPS_BL SYSTEM

  9. MAIN PROBLEMS • Old system: 1980. • Performance limited by the electronics. • No spares for electronics: obsolete components. • Obsolete CAMAC Racks. • Every detector has to be dismantled and calibrated every year. • Non standard system: different from SPS and LHC. CPS_BL SYSTEM

  10. SPS (LHC) BEAM LOSS • Ionization Chamber • N2 filled • Vp=800V (1500V) • SPS integration mode (Variable Gain)+ADC(15 bits) • LHC no gain change • Survey CPS_BL SYSTEM

  11. MEASUREMENTS(SPS) GAIN SURVEY DONE IN 2004 AFTER MORE THAN 15 YEARS OPERATION Horizontal: sector number Vertical: normalized units (mean 272) CPS_BL SYSTEM

  12. MEASUREMENTS SPS (II) • Some problems (HT Cable, noise,GND) in 10 BL over 287. • Only 5 IC were replaced (extraction lines, high radioactive places) because the gas gain changed (>20% after 20 years of operation) . • Quite uniforms measurements in the whole SPS. • Electronics: OK. • The malfunction is mainly due to network cable failures. CPS_BL SYSTEM

  13. LHC-IC TEST ON PS • Two chambers installed on the S16 of the PS (August 2007) • One in parallel with the beam pipe. • One perpendicular to the beam pipe, on the magnet. • Data taken to compare it with the actual BL system (with the same electronics or directly). • New position needs to be decided CPS_BL SYSTEM

  14. FIRST RESULTS IC1&IC2 (Direct measurement) CPS_BL SYSTEM

  15. FIRST RESULTS Electronics saturated IC1&IC2 (LHC electronics) CPS_BL SYSTEM

  16. FIRST RESULTS IC vs. ACEM with PS electronics IC vs. ACEM (direct current) CPS_BL SYSTEM

  17. BUDGET • Signal Cables: re-used with adaptors. • HV Cables : re-used (Main distribution changed on 2006) • Electronics: new • Detector: new (LHC type) • Mechanics: new (LHC type) ESTIMATED BUDGET: 250000 CHF CPS_BL SYSTEM

  18. PLANNING IF LHC ISSUES ALLOWS US, DURING 2008…. • We are going to install and test: • 8-16 IC’s in the PS. • LHC Electronics and Software in the b.368. • The threshold comparator program and the combiner program needs a modification but the Technical specification documenthas to be done before the software modification (with ABP and OP). …AND MAYBE DURING 2009 WE CAN INSTALL A NEW BL SYSTEM IN THE CPS. CPS_BL SYSTEM

  19. SUMMARY ……The actual system works well but… • It is old. • It is not standard compared with SPS and LHC. • Detectors needs to be calibrated every year • There are not spares for electronics. • Electronics doesn't match detectors capabilities. • Not uniform within the others. • The test with the LHC-BL is quite encouraging. • …..We have to continue to work on it. CPS_BL SYSTEM

  20. That's all...thank you CPS_BL SYSTEM