SEV. 4 & 5. Compliance Status. Riggers w/o Life Line. Riggers with Life Line. Observation- Riggers were working w/o Life Line on Mezzanine. Arshiya International,Panvel. Severity 5. Corrective Action - Stop work and provide life line.

salome
Download Presentation

SEV. 4 & 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SEV. 4 & 5 Compliance Status

  2. Riggers w/o Life Line Riggers with Life Line Observation- Riggers were working w/o Life Line on Mezzanine. ArshiyaInternational,Panvel Severity 5 Corrective Action- Stop work and provide life line.

  3. Observation- Gas Cutting set w/o Flash Back Arrestor/Fire Extinguisher. Arshiya International Severity 5 Corrective Action-Flash Back arrestor & fire extinguisher provided.

  4. Observation- Domestic Electrical Board w/o ELCB use.Arshiya International Severity 5 Corrective Action-Stop work till Electrical Board Replace with Industrial Plug Sockets with ELCB.

  5. Observation- Sheeters ascending descending help of bamboo structure & non std. Full body harness & some w/o full body harness. Arshiya International Severity 5 • Corrective Action- Stop work till access to roof provided.

  6. Severity 5 • Observation- Domestic Electrical Board with non-std. stand use on roof. Welspun Corrective Action- Electrical Board & stand Removed.

  7. Observation- Loose sheet bundle on roof at Welspun. Severity 5 Corrective Action- Sheet bundle fasten

  8. Severity 5 • Observation-Riggers sitting on cross bracing for fixing it. Jindal Rail Corrective Action-Stop work & instruct builder arrange boom lifter.

  9. Severity 5 • Observation- Sheeters Ascending & Descending w/o anchorage. Jindal Rail Baroda. Corrective Action-Fall arrestor provided & training given to all workers.

  10. Severity 5 • Observation- Corrective Action-