30 likes | 146 Views
Closing Plenary Meeting Report for IG THz Group (1/3). Meeting was called to order at 1:30 pm on March 19 and finished at March 20 on 5.22 pm. Number of meetings: 4 Total number of attendees : 17 Total number of contributions: 5 Contributions on Tuesday PM1
E N D
Closing Plenary Meeting Report for IG THz Group (1/3) • Meeting was called to order at 1:30 pm on March 19 and finished at March 20 on 5.22 pm. • Number of meetings: 4 • Total number of attendees :17 • Total number of contributions: 5 • Contributions on Tuesday PM1 • Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), “Launching a Study Group on THz”; (Document 15-13-0130-00-0thz) • Contribution #2 : Hiroyo Ogawa, ARIB, (Japan), “Optical interconnection of data center”; (Document 15-13-0181-02-0thz) • Contribution #3 : Sebastian Priebe, TU Braunschweig (Germany) ,“MAC Layer ConceptsforTHz Communications”; (Document 15-13-0119-00-0thz) Thomas Kürner, TU Braunschweig
Closing Plenary Meeting Report for IG THz Group (2/3) • Contributions on Wednesday PM1 Contribution #4 : John d’Ambrosio, Dell (USA), “Introduction: Industry Connections in IEEE 802”; (Document 15-13-0146-00-0thz) • Contributions on Wednesday PM 2 Contribution #5 : Michael Grigat , Deutsche Telekom (Germany), “Propagation Aspects of Terahertz Outdoor Fixed Wireless Links”; (Document 15-13-0175-01-0thz) Work on theTechnical ExpectationDocument(TED)“. The content of the TED has been discussed and updated (Document 15-11-0745-07-0thz) • Contribution to 802.15 SC WNG on Wednesday AM2 Thomas Kürner, TU Braunschweig (Germany), “Launching a Study Group on THz”; (Document 15-123-0130-01-0thz Thomas Kürner, TU Braunschweig
Closing Plenary Meeting Report for IG THz Group (3/3) • Discussions • Update of the Technical ExpectationsDocument (11/0745r7) • Discussion on spinning-off a Study Group on „ Beam switchable wireless point-to-point 40/100 Gbps links” • Severalpossibilitiestoincreaseinterestfromindustryhavebeendiscussed • GoingthroughIndustry Connection may not help on short-term • Next stepsuntiltheGenenvaPlenary • Directapproach of potential usersfor a presentationatGenevaor a at least in a TelcobeforetheGeneva Meeting • Forthedatacenterapplicationsettingup a link with 802.3 • Preparation of a moredetailedpresentation on wirelessdatacentersfortheGenevameeting • AtGenevacheckingstatustomake a motiontowards a Study Group Thomas Kürner, TU Braunschweig