1 / 3

Closing Plenary Meeting Report for IG THz Group (1/3)

Closing Plenary Meeting Report for IG THz Group (1/3). Meeting was called to order at 1:30 pm on March 19 and finished at March 20 on 5.22 pm. Number of meetings: 4 Total number of attendees : 17 Total number of contributions: 5 Contributions on Tuesday PM1

Download Presentation

Closing Plenary Meeting Report for IG THz Group (1/3)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Closing Plenary Meeting Report for IG THz Group (1/3) • Meeting was called to order at 1:30 pm on March 19 and finished at March 20 on 5.22 pm. • Number of meetings: 4 • Total number of attendees :17 • Total number of contributions: 5 • Contributions on Tuesday PM1 • Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), “Launching a Study Group on THz”; (Document 15-13-0130-00-0thz) • Contribution #2 : Hiroyo Ogawa, ARIB, (Japan), “Optical interconnection of data center”; (Document 15-13-0181-02-0thz) • Contribution #3 : Sebastian Priebe, TU Braunschweig (Germany) ,“MAC Layer ConceptsforTHz Communications”; (Document 15-13-0119-00-0thz) Thomas Kürner, TU Braunschweig

  2. Closing Plenary Meeting Report for IG THz Group (2/3) • Contributions on Wednesday PM1 Contribution #4 : John d’Ambrosio, Dell (USA), “Introduction: Industry Connections in IEEE 802”; (Document 15-13-0146-00-0thz) • Contributions on Wednesday PM 2 Contribution #5 : Michael Grigat , Deutsche Telekom (Germany), “Propagation Aspects of Terahertz Outdoor Fixed Wireless Links”; (Document 15-13-0175-01-0thz) Work on theTechnical ExpectationDocument(TED)“. The content of the TED has been discussed and updated (Document 15-11-0745-07-0thz) • Contribution to 802.15 SC WNG on Wednesday AM2 Thomas Kürner, TU Braunschweig (Germany), “Launching a Study Group on THz”; (Document 15-123-0130-01-0thz Thomas Kürner, TU Braunschweig

  3. Closing Plenary Meeting Report for IG THz Group (3/3) • Discussions • Update of the Technical ExpectationsDocument (11/0745r7) • Discussion on spinning-off a Study Group on „ Beam switchable wireless point-to-point 40/100 Gbps links” • Severalpossibilitiestoincreaseinterestfromindustryhavebeendiscussed • GoingthroughIndustry Connection may not help on short-term • Next stepsuntiltheGenenvaPlenary • Directapproach of potential usersfor a presentationatGenevaor a at least in a TelcobeforetheGeneva Meeting • Forthedatacenterapplicationsettingup a link with 802.3 • Preparation of a moredetailedpresentation on wirelessdatacentersfortheGenevameeting • AtGenevacheckingstatustomake a motiontowards a Study Group Thomas Kürner, TU Braunschweig

More Related