1 / 35

M-Max Training

M-Max Training. Tom Neuberger – Product Manager VFD’s. Agenda. 30 min Intro's and review of Eaton VFD strategy 45 min MMX features/benefits discussion and review of training guide 15 min MMX expansion discussion / Pricing 90 min MMX demo and website review – PC Software?

Download Presentation

M-Max Training

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M-Max Training Tom Neuberger – Product Manager VFD’s

  2. Agenda • 30 min Intro's and review of Eaton VFD strategy • 45 min MMX features/benefits discussion and review of training guide • 15 min MMX expansion discussion / Pricing • 90 min MMX demo and website review – PC Software? • 180 min Application Training

  3. Product Line Overview - Drives Clean Power CPX 18 pulse CFX Passive Filter Performance LCX, SPX, DC fed Machinery MVX,NFX,SLX,M-Max HVAC HVX, JCI, York Industrial GVX, SVX SVX Industrial SVX Enclosed HVX9000 HVX Intellipass/ Intellidisconnect JCI, BAC brand labeled

  4. Current & Future Drives Product Platforms DF6 Intellipass HVX9000 DV6 SVX9000 GVX9000 DF51 DV51 SLX9000 CPX9000 MVX9000 M-Max H-Max V-Max NFX9000 Industrial / WWT High Performance Machinery/OEMs HVAC 10 Product Platforms being Replaced by 3 Product Platforms LCX9000 SPX9000

  5. Training Guide Review • CD • Features/Benefits • Product Selection • Parameter Guide • Default Parameter Set • Demo Overview

  6. Expansion / Pricing • 1st Gen vs. 2nd Gen • FS4 & FS5 • Margin Config.xls

  7. M-Max Demo / PC Software • www.eaton.com/m-max • M-Max Demo.exe • MaxConnect • MaxLoader

  8. Review User Manual • Detailed Parameter List (page 65) • Abbrev list (page 150) • Parameter Groups (P) • P1 Default Settings • P2 Analog Inputs • P3 Digital Inputs • P4 Analog Outputs • P5 Digital/Relay Outputs • P6 Drives Control • P7 Motor Data • P8 Protective Functions • P9 PID • P10 Fixed Frequencies • P11 V/Hz Characteristics • P12 Braking • P13 Logic • P14 Secondary Parameter Set • System Parameters (S) • Monitoring Parameters (M)

  9. Parameter Format Explanation

  10. Default I/O (Factory Setting - FS) • DI1 = start fwd • DI2 = stop/start rev • DI3 = Fixed Freq B0 (12hz) • DI4 = Fixed Freq B1 (18hz) • DI5 = Fault Reset • DI6 = PID Controller Deactivate • RO1 = Run • RO2 = Fault • DO = Ready

  11. Startup Wizard • Page 64 or 147 • 17 parameters • Basic control and motor nameplate data • 4 macros / applications • Basic • Pump • Fan • High Load • Three ways to implement • Initial power up • Press and hold “STOP” button for 5 seconds • Set parameter S4.2 = 1 • P1.1 = 1 (factory setting/default)

  12. Duplex Pump Application • Start / Stop send by PLC (Maintained 24V inputs) • Speed Control 0-10V DC • Min Freq = 30 Hz • Max Freq = 60 Hz • Start Function/Accel Time = Ramp/10 sec. • Stop Function/Decel Time = Free Coasting/10 sec. • Motor Data: • FLA: 1.0A • 1800 rpm • .83 power factor • 230V • 60 Hz

  13. Duplex Pump Parameter Setup • Reset drive to factory defaults • Can be configured through quick start wizard

  14. Duplex Pump Parameter Setup • P1.1 (Quick Start Parameters) = 1 • P1.2 (Application) = 1 (pump) • P1.3 (Country Specific Defaults) = 1 (US) • P6.1 (Primary Remote Control Source) = 1 (I/O) • P6.2 ( Primary Remote Speed Ref) = 3 (AI1) • Also need to confirm microswitch S2 • P6.3 (Min Freq) = 30 Hz • P6.4 (Max Freq) = 60 Hz • P6.5 (Accel Time) = 10 sec • P6.6 (Decel Time) = 10 sec

  15. Duplex Pump Parameter Setup • P6.7 (Start Function) = 0 (ramp) • P6.8 (Stop Function) = 0 (free coasting) • P7.1 (Motor FLA) = 1.0A • P7.3 (RPM) = 1800 rpm • P7.4 (Power Factor) = .83 • P7.5 (Motor Voltage) = 230V • P7.6 (Motor Freq) = 60 Hz • P11.7 (Torque Increase) = 0 (disabled)

  16. Duplex Pump Extra Credit • We need to make sure that the motor can not run backwards • The customer would like to start a second pump when the frequency of pump #1 exceeds 50hz.

  17. Duplex Pump Parameter Setup Extra Credit • First need to change parameter P1.1 = 0 • Motor can not run backwards: • P6.23 (REV Blocked) = 1 (enabled) • Disabling the Start Rev (P3.3) does not disable running the drive in reverse in “keypad” mode. • Exceed 50 Hz: • P5.1-3 (Digital or Relay Output) = 10 (Freq Monitoring 1) • P5.4 (Freq Monitoring 1) = 2 (P5.5 – P6.4, high limit) • P5.5 (Freq Monitoring 1 Ref Value) = 50 hz • On/Off delays???

  18. HVAC Duct Pressure Application • The customer has an HVAC system that needs to maintain a duct pressure of 75psi. They are using a 0-200psi pressure transducer to monitor the duct pressure. The transducer’s output is a 0-10V signal. • Min Freq = 0hz • Accel and Decel = 5 seconds • Motor Data: • FLA: 1.0A • Current Limit: 1.2A • 1800 rpm • .85 power factor • 230V • 60 Hz

  19. HVAC Duct Pressure Hints and Clues • Understanding PID • Setpoint value as %. • Example: Customer has a 0-10 psi transducer and would like to maintain a pressure of 4 psi. • Convert psi to % based on transducer range • 4/10 = x/100 • x = 40% • Hints: The only parameters that you should need to modify are the following: P9.1, P9.4, P9.5, P9.6

  20. HVAC Duct Pressure Parameter Setup • P1.1 = 0 (All parameters) • P1.2 = 2 (Fan) • P1.3 = 1 (NA) • P2.1 (AI1 signal range) = 0 (0-10V) • P6.3 (Min Freq) = 0 hz (Default is 20hz) • P6.5 = 5 sec (Default is 20 seconds) • P6.6 = 5 sec (Default is 20 seconds) • P7.1 = 1.0 • P7.2 = 1.2 • P7.3 = 1800

  21. HVAC Duct Pressure Parameter Setup • P9.1 (PID Controller) = 1 (Activated) • P9.4 (PID Controller Keypad Reference) = 37.5% • 75/200 = x/100 • 200x = 7500 • x = 7500/200 = 37.5 • P9.5 (PID Controller Setpoint Source) = 0 (Keypad) • P9.6 (PID Controller Actual Value) = 1 (AI1)

  22. HVAC Duct Pressure Extra Credit • The customer would like the drive to conserve energy “sleep” if the output frequency falls below 10hz for 5 seconds or longer. It should “wake up” once the pressure transducer drops below 70 psi. • The customer would also like the ability to disable the PID loop and follow a standard 0-10V signal supplied by a PLC. • Lastly the customer would like the drive to monitor the duct pressure.

  23. HVAC Duct Pressure Parameter SetupExtra Credit • Sleep Mode: • P9.12 (Frequency) = 10 hz • P9.13 (Wake up) = 35% (70/200 = x/100) • P9.14 (Delay)= 5 sec • PID Disable • P2.1 (AI1, signal range) = 0 default • P3.12 (PID Disable) = 6 default • P6.2 (Primary Remote Speed Ref) = 3 default • Monitor Duct Pressure • P9.19 (PID Controller, Process Value Scale) = 2

  24. Conveyor Application • Start and stop by PLC (Maintained 24V Inputs) • Sensor input required for motor to start • Primary speed control 2-10V Utilizing AI2 sent from PLC • Set speed of 20 Hz also controlled from a PLC • Accel and Decel = 5 seconds • Motor Data: • FLA: 1.4A • Current Limit: 1.75A • 1700 rpm • .87 power factor • 230V • 60 Hz

  25. Conveyor Application • Reset drive to factory defaults • Can be partially configured through quick start wizard.

  26. Conveyor Parameter Setup • P1.1 (Quick Start) = 0 (All Parameters) • P1.2 (Application) = 3 (High Load) • P1.3 (Country Defaults) = 1 (NA) • P2.5 (AI2 Signal Range) = 1 (2-10V) • Also confirm microswitch S3 • What is AL50? • P3.1 (Start/Stop Logic) = 3 (FWD/REV) • P3.8 (Run Enable) = 3 (2-6 Digital Input) • If DI2 you need to disable Start Rev signal (P3.3 = 0) • Be wary of default I/O • P3.9 (fixed freq, binary B0) = 4 (3-6 Digital Input) • P3.10 (fixed freq, binary B1) = 0 • Who’s unit was running at 24hz as the preset speed? (B0 + B1 = 24hz FF3) • P6.2 (Primary Remote Speed Ref) = 4 (AI2) • P6.5 (Accel) = 5.0 • P6.6 (Decel) = 5.0 • P10.2 (FF1) = 20hz

  27. Conveyor Application Extra Credit • The customer would like to count packages with an Eaton sensor. Packages (spaced approx 10 seconds apart) travel down a conveyor and past a sensor before they drop into a box. It takes the package 5 seconds to reach the box after it passes the sensor. Once the box has 10 packages the customer would like to run a second conveyor (powered by an XT starter, of course) for 3 seconds to transport the box to a shrink wrapper and a new box will be set in place. Cycle repeat…

  28. Conveyor Application Extra Credit (Simplified) • VFD to count packages via sensor input • When counter = 10 • Activate various outputs • RO to activate XT coil (start second conveyor) • Time delay on 5 sec • Time delay off 3 sec • DO active to DI (reset counter) • Repeat!

  29. Conveyor ApplicationExtra Credit Parameter Setup • Counter input signal: • P3.23 (Counter input signal) = 5 (digital input 5, or any input) • P3.29 (counter reference value)= 10 • Counter output • P5.1 (RO1 signal) = 20 (counter value 1 reached) • P5.2 (RO2 signal) = 0 (deactivated) • P5.3 (DO1 signal) = 20 (Use the DO to reset counter) • Counter reset input • P3.24 = 6 (digital input 6, could be fed directly from DO) • Time delays • P5.14 (RO1, on delay) = 5s • P5.15 (RO1, off delay) = 3s

  30. Thank you! Tom Neuberger – Product Manager VFD’s

More Related