1 / 10

Mine Safety System Chris Butterfield Frankie Cruz Richard Downs 09/05/2012

STATUS REPORT #1 . Mine Safety System Chris Butterfield Frankie Cruz Richard Downs 09/05/2012 Replace outdated mine safety system with modern personnel l tracking and vitals monitoring system which includes an additional integration capabilities . Need / Milestones.

samira
Download Presentation

Mine Safety System Chris Butterfield Frankie Cruz Richard Downs 09/05/2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATUS REPORT #1 Mine Safety System • Chris Butterfield • Frankie Cruz • Richard Downs 09/05/2012 • Replace outdated mine safety system with modern personnell tracking and vitals monitoring system which includes an additional integration capabilities .

  2. Need / Milestones • Replace an outdated personnel safety systems in present mining with a new state of art personnel tracking and vital monitoring system. • Reliable heart rate monitoring – 9/30/12 • Wireless antenna cluster 9/30/12 • GUI mock up, using virtual inputs 9/30/12

  3. Recent Tasks • Heartbeat monitor design • GUI layout and requirement • Deciding at what location processing will occur • Physical layout to include modular design.

  4. Ongoing Progress • Reverse engineer chest strap heart rate • Respiration sensor conceptualized • Transmitting heartbeat over the Zigbees

  5. Upcoming Tasks • Reverse engineer chest strap heart rate • Respiration sensor conceptualized • Transmitting heartbeat over the Zigbees

  6. Block Diagram as of 05Sept12

  7. Project Schedule as of 05Sept12

  8. Project Schedule as of 05Sept12

  9. Project Schedule as of 05Sept12

  10. Questions?

More Related